![background image](http://html1.mh-extra.com/html/national-instruments/scxi-1300/scxi-1300_installation-manual_710170004.webp)
SCXI-1300/1301 Terminal Block
4
www.ni.com
6.
Reinstall the strain-relief bar and tighten the strain-relief screws.
7.
Reinstall the top cover and tighten the top cover screws.
When connecting signals to the SCXI-1300 terminal block, follow the
labeling on the SCXI-1300 terminal block, as indicated in Figure 2.
Figure 2. SCXI-1300 Signal Connections
1
Screw Terminals
2
Mating Connector
2
1
Summary of Contents for SCXI-1300
Page 10: ......