![background image](http://html1.mh-extra.com/html/national-instruments/fieldpoint-fp-20-series/fieldpoint-fp-20-series_quick-start-manual_709185003.webp)
C.
Slide module into position and lock rail clip.
Installing the Terminal Bases
Caution
Connect terminal bases to the network module before
applying power to the module. Do
not connect or disconnect terminal
bases while power is applied to the network module.
A.
Unlock rail clip.
B.
Press base onto rail.
C.
Slide base into position and
lock rail clip. Be careful not
to bend any pins.
D.
Repeat for each terminal
base, up to nine for each
network module in most
cases. Make sure there are
no gaps between terminal
bases.
©
National Instruments Corporation
3
FP-20xx Quick Start Guide
322759e.qxp 4/22/2004 4:00 PM Page 3