![National Instruments FieldPoint cFP-1808 Quick Start Manual Download Page 8](http://html1.mh-extra.com/html/national-instruments/fieldpoint-cfp-1808/fieldpoint-cfp-1808_quick-start-manual_3467364008.webp)
©
National Instruments Corporation
7
cFP-1808 Quick Start Guide
2. Install I/O Modules on the Backplane
1. Align the captive screws on the
I/O module with the holes on the
backplane.
2. Press firmly to seat the I/O
module on the backplane.
3. Using a number 2 Phillips
screwdriver with a shank of at
least 64 mm (2.5 in.) length,
tighten the captive screws to
1.1 N · m (10 lb · in.) of torque.
4. Repeat this procedure to install
additional I/O modules on the
backplane.
3. Install Connector Blocks on the Backplane
In order to connect I/O modules to input signals or to external loads, you need to
install a cFP-CB-
x
connector block or other connectivity accessory for each I/O
module on the backplane. Use the connector socket to the right of each I/O module
socket.
Caution
Do not insert or remove connector blocks or other connectivity
accessories while power is applied to them.
Summary of Contents for FieldPoint cFP-1808
Page 1: ...cFP 1808 ...