![background image](http://html1.mh-extra.com/html/national-flooring-equipment/14420/14420_instruction-manual_3369241019.webp)
Scheduled Maintenance Chart
19
Operation
Interval
Daily
First 8 Hrs. Every 50 Hrs. Every 100
Hrs.
Every 200
Hrs.
Every 300
Hrs.
Every 400
Hrs.
Every 500
Hrs.
Check & add engine oil
Check for loose or lost fasteners
Check for oil leakage
Inspect fuel hose and connections
Clean engine dust filter
Inspect pad holder
Change engine oil
Change engine oil filter
Check & clean air cleaner paper element
Check & clean air cleaner foam element
Inspect battery and battery connections
Replace air cleaner paper element
Replace air cleaner foam element
Inspect, clean, & re-gap spark plugs, Replace if
necessary
Check & adjust valve clearance.* Retorque
heads.*
Clean & lap valve seating surface.*
Check engine emissions*
Clean cooling fins
Inspect drive belt
Inspect burnishing head assembly
Replace drive belt
As Required
* Contant NFE customer service.