10
You’re over halfway done! Now would be a good
time to call in that pizza order.
Now let’s get those shelves in. Insert the Shelf
Pins (9) into the Left Side Panel (B), Right Side
Panel (C) and Middle Panel (D). Then slide the
Shelves (J) into place.
Step 6
J
J
9
9