
TABLE OF CONTENTS
SECTION 1.
General Information
1A.
Introduction ................................................... 1
1B.
Warranty ....................................................... 1
1C.
Technical Assistance .................................... 1
SECTION 2.
Installation Instructions
2A.
General Information ..................................... 2
2B.
Field Assembly ............................................. 2
2C.
Site Location ................................................ 3
2C-1.
Installation Information ................................. 3
2C-2.
Outdoor Installation (U.S. only) .................... 3
2C-3.
Flooring - Typical Installation ....................... 4
2D.
Combustion and Ventilation Air Supply ........ 4
2D-1.
Outdoor Air Supply ....................................... 5
2D-2.
Indoor Air Supply .......................................... 5
2D-3.
Exhaust Fans or Vents ................................. 5
2E.
Venting of Combustion Products .................. 5
2E-1.
General Information ..................................... 5
2E-2.
Replacement of Existing Heater ................... 6
2F.
Water Flow ................................................... 6
2F-1.
Reversible Water Connections ..................... 6
2F-2.
Water Chemistry .......................................... 8
2F-3.
Freeze Protection ......................................... 9
2F-4
Water Hardness ........................................... 9
2F-5.
Pump Requirements ..................................... 9
2F-6.
Pressure Buildup in Water System .............. 9
2F-7.
Pressure Relief Valve ................................... 9
2F-8.
Water Pressure ............................................ 9
2F-9.
Pump Installation ........................................ 12
2F-10. Storage Tank Installation ............................ 12
2F-11. Thermal Circulation of Hot Water in
Cold Water Supply Lines ............................ 12
2G.
Gas Supply and Piping ............................... 13
2G-1.
General Instructions ................................... 13
2G-2.
Special Precautions for Propane Gas ........ 14
2H.
Electrical Wiring ......................................... 14
2I.
Combined Space Heating/Potable
Water Heating Systems ............................. 14
2I-1.
Combined Space Heating .......................... 14
2I-2.
Potable Water Heating ............................... 14
SECTION 3.
Operating Instructions
3A.
Normal Operating Sequence ...................... 15
3B.
Start-Up Procedure .................................... 15
3C.
Setting the Temperature Controls .............. 15
3D.
Adjustment for Minimum Input Rate
(models with modulating gas valve) ........... 18
3E.
Hi-Limit Switch Checkout ........................... 18
3F.
Shut-Down Procedure ................................ 18
SECTION 4.
Maintenance
4A.
General Instructions ................................... 18
4B.
Replacement of Gas Controls .................... 19
4C.
Heat Exchanger .......................................... 20
4C-1.
Inspecting the Heat Exchanger .................. 20
4C-2.
Cleaning the Heat Exchanger .................... 21
SECTION 5.
Troubleshooting
5A.
Gas Pressure Tests .................................... 21
5A-1.
Checking the Main Line Gas Pressure ....... 21
5A-2.
Checking the Manifold
Regulated Gas Pressure ............................ 22
5B.
Electrical Troubleshooting .......................... 22
5B-1.
Heater Does Not Come On ........................ 22
5B-2.
Testing the Transformer ............................. 23
5B-3.
Testing the Electrical Power Supply ........... 23
5B-4.
Testing the Manual Reset
Hi-Limit Switch ........................................... 23
5B-5.
Testing the Flow Switch ............................. 23
5B-6.
Testing the Fusible Link
(Flame roll-out switch) ................................ 24
5B-7.
Testing the Fuse ......................................... 24
5B-8.
Testing the Ignition Control
(for spark ignition) ...................................... 24
5B-9.
Testing the Ignition Control
(for standing pilot) ...................................... 25
5B-10. Testing the High Voltage Ignition Lead ...... 25
5B-11. Testing the Safety Shutoff
(for standing pilot) ...................................... 26
5B-12. Testing the Safety Shutoff
(for automatic pilot) .................................... 26
5B-13. Testing the Igniter Electrode ...................... 26
5B-14. Testing the Pilot Thermocouple
(for standing pilot) ...................................... 26
5B-15. Testing for Pilot burner
(for spark ignition) ...................................... 26
5B-16. Testing for Burner Ignition
(for standing pilot) ...................................... 27
5B-17. Heater Will Not Shut Off ............................ 27
5B-18. On-Off Main Burner Cycling ....................... 27
5B-19. Testing the Terminal Strip/External
Controls ...................................................... 27
SECTION 6.
Parts List
6A.
General Information ................................... 28
6B.
Parts List .................................................... 28
N
ATCO
N
ATCO