INSTALL_OPS
MANUAL AMENDMENT
Manual: SM55 PTA12-10 Amendment #: 2
Document # SM55\100\Install_Ops\809-0002
Amendment Date:
Jun 22, 2005
Amendment #2
Jun 22, 2005
Page 1
ENG-FORM: 809-0109.DOT
CONFIDENTIAL AND PROPRIETARY TO NORTHERN AIRBORNE TECHNOLOGY LTD.
The purpose of this amendment is to update the installation drawings.
Amendment Instructions:
Remove Pages
Replace With Pages
1
2-3 to 2-4 Rev 4.00 Amendment #1
2-3 to 2-4 Rev 4.00 Amendment #2
Remove Drawings (Section 2)
Replace or add Drawings (Section 2)
2
PTA12\100\403-0 Rev 1.10
PTA12\100\403-0 Rev 1.11
PTA12\100\403-1 Rev 1.10
PTA12\100\403-1 Rev 1.11
PTA12\100\403-2 Rev 1.10
PTA12\100\403-2 Rev 1.11
PTA12\100\403-3 Rev 1.10
PTA12\100\403-3 Rev 1.11
PTA12\100\403-4 Rev 1.10
PTA12\100\403-4 Rev 1.11
PTA12\100\405-0 Rev 1.00
PTA12\100\405-0 Rev 1.01
PTA12\100\922-0 Rev 1.00
PTA12\100\922-0 Rev 1.01
Note
: Ensure that all drawings are inserted in the order shown on the latest drawing lists.
3
Update the Amendment Record sheet at the front of the manual.
4
Insert this page into the manual after the Amendment Record sheet (page ii).
Manual Amendment ends after the following amended pages
Summary of Contents for PTA12-100
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 10: ......
Page 12: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 42: ......