6
NARVON SUMMIT
INSTALLATION
UNPACKING
1. When moving your machine into the area where it will be installed, make sure that nobody is obstructing the path.
2. The machine must be moved by at least two people. Make sure to transport the unit in a vertical position.
3. Make sure to avoid any obstructions when moving the machine. Pay special attention for any possible protruding parts.
4. It is prohibited to make additional cuts in the packaging.
5. Try not to damage the packaging as it could be used again in the future.
Damages that the machine may suffer during transport and moving are not covered by the warranty. Repair and replacement of
parts that may get damaged must be paid for by the customer.
TREATMENT OF PACKAGING
Recycling:
After you have unpacked machine, you can properly dispose of all packaging materials.
Conserve for future use:
If you do not wish to dispose of the packaging, or if you wish to place the unit back in storage, you
can conserve the packaging for future transporting of the machine.
BEFORE THE FIRST START-UP
Is is recommended to properly wash and sanitize the machine before the first use.
Parameter Configuration:
Perform all install procedures as stated in this manual.
POSITIONING
All of the operations illustrated in this section are to be exclusively carried out by specialized technicians.
The following requirements
must be met before installing
the machine:
1. The voltage of your power source
must coincide with that indicated
on the machine's serial plate.
2. The machine must be installed in
a room that is between:
20°C and 40°C
68°F and 104°F.
3. Must be installed in a place where
it can be monitored by qualified
personnel.
4. The machine must be placed
securely on a solid, flat, and stable
surface.
5. The machine must be placed in
an area that has easy access to a
power source.