English
17
Technical specification
Cordless hammer drill/driver:
Model
ASP 14-2A ASP 18-2A
Voltage
14.4 V 18.0 V
Idle speed:
1st range
0–460 rpm
0–460 rpm
2nd range
0–1 600 rpm
0–1 600 rpm
Max. number of impacts:
1st range
0–6 900 ipm
0–6 900 ipm
2nd range
0–24 000 ipm
0–24 000 ipm
Max. torque
54 Nm
60 Nm
Chuck – scope of clamping
0.8–10 mm
1.5–13 mm
Wood screws - dia. max.:
7 mm
8 mm
Drilling - dia. max.:
into metal
10 mm
13 mm
into wood
35 mm
40 mm
into masonry
10 mm
13 mm
Threaded spindle for chuck
1/2“-20 UNF
1/2“-20 UNF
Weight w/o accumulators
1.36 kg
1.48 kg
Charger:
Model
AN-UNI C
Input voltage
110–240 V
Frequency
50–60 Hz
Power input
80–100 W
Output voltage
16.6–20.7 V
Charging current
4 A
Charge time
ca 25–45 min*
Weight
0.7 kg
Class of protection
II /
Accumulator:
Model
AP 14 LE AP 14 LP AP 18 LE AP 18 LP
Voltage 14.4 V 14.4 V 18.0 V 18.0 V
Cell
type
Li-Ion Li-Ion Li-Ion Li-Ion
Capacity
1.5 Ah 3.0 Ah 1.5 Ah 3.0 Ah
Temperature
of
charging
0–45 °C 0–45 °C 0–45 °C 0–45 °C
Charge
time
ca 25 min ca 45 min ca 25 min ca 45 min
Monitor. of the temp.of charging
thermistor
thermistor
thermistor
thermistor
Weight
0.44 kg 0.68 kg 0.52 kg 0.78 kg
* Depending on model and capacity of the accumulator to be charged!
Description:
1 ...........Accumulator
2 ...........Accumulator clamp
3 ...........Switching–in push button with speed control
4 ...........Reversing switch
5 ...........Speed changing switch
6a .........Adjusting ring for torque setting
6b .........Adjusting ring for drilling/hammer-drilling
7 ...........Workplace LED lighting
8 ...........Chuck clamp sleeve
9 ...........Accumulator state indication panel
10a .......Indication switch
10b ......Accumulator state indicator
11 .........LED signal lights
12 .........Charger
13 .........Vent holes of the accumulator air cooling system
Zobrazené anebo popsané příslušenství nemusí patřit do objemu
dodávky.
Scope of use
The cordless hammer drill/drivers are specified for screwing and
drilling into metals, wood and plastics and for hammer-drilling
into masonry.
Double insulation
To ensure maximum safety of the user our tools are designed and
built to satisfy applicable European standards (EN standards). Tools
with double insulation are marked by the international symbol of
a double square. These tools must not be grounded and a two-wire
cable is sufficient to supply them with power. Tools are shielded in
accordance with EN 55014.
Charging battery pack instructions
1. Make sure that circuit voltage is the same as than shown on
the charger specification plate. Connect the charger (12) to
power source. Red LED signal light should light up (11). This
indicates the charger is ready to being charging. If the red LID
light is not on, check connection to the power source. If the
power source is OK, transport the charger into the authorized
service workshop!
2. Position the accumulator/battery pack (1) into the charger as
far as the stop, see the Fig.
Summary of Contents for ASP 14-2A
Page 3: ...3...
Page 5: ...5 2 1 2 1 2 1 3 4 5 6a 6a 6b 6b 7 8 9 10a 10b 11 12 13...
Page 26: ...26 1 2 a RCD RCD 3 a 4 a 5 a...
Page 42: ...42...
Page 43: ...43...