Installation
6-
3
6-6 Installation Check list
Before operation ensure the following steps are taken:
•
Check the line voltage to ensure the compatibility with the equipment
requirements.
•
Ensure that the to be provided fuse or breaker current rating is
appropriate for the equipment setup.
•
Protection earth line is connected to mains supply input on the rear
panel.
•
Ensure that cables and terminals used to connect PMM LISN Network
to supply line and to Equipment Under Test are suitable for the setup
current rating and proper safety insulation.
•
Verify that 50 ohm RF cable to the EMI Signal Analyzer input be
disconnected before switch on or off the supply line.
•
Prior to energizing either unit verify that a common ground connection
exists between all equipment in the test setup and safety protection
earth.
To allow correct equipment ventilation ensure that the vent grid on
the equipment covers be free by any obstructing object.
Summary of Contents for PMM L3-64
Page 10: ...X EC Conformity This page has been left blank intentionally...
Page 14: ...1 4 General Information This page has been left blank intentionally...
Page 20: ...2 6 PMM L3 32 This page has been left blank intentionally...
Page 32: ...5 4 PMM L3 500 This page has been left blank intentionally...
Page 36: ...6 4 Installation This page has been left blank intentionally...
Page 42: ...Suggerimenti Commenti Note Suggestions Comments Note...