background image

Narada

 

Power

 

Source

 

Co.,

 

Ltd.

                                                                                 

313K

 

series

 

12V

 

battery

 

operation

 

manual

 

V1.5

         

 

 
 

Step

 

3

 

Connect

 

battery

 

with

 

output

 

connector

 

with

 

hex

 

bolts,

 

flat

 

washer

 

and

 

spring

 

washer,

 

move

 

protective

 

cover

 

to

 

appropriate

 

place,

 

shown

 

as

 

follow

 

drawing,

 

 
 

Hex bolt

P r otective cover 
for output term inal

Spring washer

Flat washer

Output connector

 

 

Summary of Contents for 313K Series

Page 1: ...VALVE REGULATED SEALED LEAD ACID BATTERY High Temperature Applications OPERATION MANUAL Version V1 5 NARADA POWER SOURCE CO LTD 313K Series 12V Battery...

Page 2: ...ns 5 2 3 Construction 5 2 4 Types and Dimensions 5 Chapter Three Technical characteristic 3 1 Operation environment 6 3 2 Operation conditions 6 3 3 Storage conditions 7 3 4 Battery installation 7 3 5...

Page 3: ...and heath Please check local laws and regulations to get the validity handle ways or send the equipment to authorized service center z The replacement of battery can only be done by persons who know w...

Page 4: ...e than 100 rated capacity Residue capacity more than 94 after storage battery 90 days 25 C 2 1 5 Excellence deep cycle performance a patented anti corrosion alloy technology special lead paste formula...

Page 5: ...ower transformer system Navigation aid signaling system Radio and broadcasting station Emergency lighting system Other standby cyclic system 2 3 Configuration Fig 1 1 Configuration 2 4 Types and Dimen...

Page 6: ...o EN 50272 2 standard If charge battery with equalization voltage ventilation quantity requirement should be as five times as float charge 3 1 2 Temperature 313K series 12V batteries are high temperat...

Page 7: ...le as you can 3 4 Battery installation 3 4 1 Open package inspection z Inspection Battery appearance no damage z Check parts complete z Read Installation drawing safety cautions 3 4 2 Installation saf...

Page 8: ...ttery operation manual V1 5 8 Step 2 Connect batteries with copper bar hex bolts flat washer and spring washer and move protective cover to appropriate place shown as follow drawing Hex bolt Protectiv...

Page 9: ...manual V1 5 9 Step 3 Connect battery with output connector with hex bolts flat washer and spring washer move protective cover to appropriate place shown as follow drawing Hex bolt Protective cover fo...

Page 10: ...rallel connection do series connection first then parallel connection In order to ensure better cooling conditions space between batteries should be 10mm at least 4 Recommend connection method 1 24V s...

Page 11: ...then parallel connection installation diagram 3 48Vsystem 2 layers 8 blocks series first then parallel connection installation diagram 4 48Vsystem 2 layers 8 blocks series first then parallel connecti...

Page 12: ...ust on surface of battery pole before and after installation 6 Electrify battery bank after measure total voltage correctly 3 5 Charge 3 5 1 Float charge parameter Float voltage 2 24V cell 35 Charge c...

Page 13: ...f temperature is below 5 Setting charge capacity 110 120 of discharge capacity 3 5 4 Lower temperature below 5 longer charge time It is easy over charge at high temperature Charge at recommended tempe...

Page 14: ...stant current discharge data A 35 12HTB 100A 5 min 10 min 15 min 30 min 1hr 2hr 3hr 5hr 8hr 10hr 12hr 20hr 24hr 1 60V 288 209 168 111 69 5 41 3 30 9 19 5 13 1 10 7 9 11 5 71 4 81 1 67V 287 208 168 110...

Page 15: ...ster 2 Charger and discharger special for storage battery portable 4 2 Maintenance In order to assure service life the batteries should be correctly inspected and maintained The maintenance methods of...

Page 16: ...0 89C10 1 78 I10 1 80 3HR C3 0 75C10 2 5 I10 1 80 1HR C1 0 55C10 5 5 I10 1 75 Standard Capacity temperature is base on 25 Convert the testing capacity Cr to standard capacity Ce according to formula i...

Page 17: ...and crack Replace reverse polarity connection and crack battery 4 There are white crystal in terminal or valve ports If it is false leaking clean white crystals with a soft cloth dipped with soapy wat...

Page 18: ...e Hangzhou China Singapore 408559 Tel 86 571 28827007 28827013 Tel 65 6848 1191 Fax 86 571 28828290 Fax 65 6749 3498 Email intl narada biz Email sales narada com sg Europe Narada Europe UK Limited Spe...

Page 19: ...manual V1 5 19 Annex 1 VRLA Battery Regular Maintenance Record Type Place Status Number of battery Total Voltage V Current A Temperature No Voltage V No Voltage V 1 13 2 14 3 15 4 16 5 17 6 18 7 19 8...