EN
W415-1673 / A / 10.07.19
23
installation
MINIMUM CLEARANCE TO COMBUSTIBLE CONSTRUCTION FROM APPLIANCE AND VENT
SURFACES:
-
0" (0mm) to wall mounting plate fl anges
-
1" (25.4mm) to bottom and sides of vent pipe for horizontal runs*
-
3" (76.2mm) to top of vent pipe for horizontal runs*
36"
(91.4cm)
MAX.
7"
(177.8mm)
MIN.
7"
(177.8mm)
MIN.
36"
(91.4cm)
MAX.
5.5" (139.7mm) MIN.
15" (38.1cm)
MIN.
6" (152.4mm) MIN.
5.5" (139.7mm) MIN.
6" (152.4mm) MIN.
15" (38.1cm)
MIN.
TYPICAL
INSTALLATION
ALCOVE
INSTALLATION
SIDE VIEW
ALCOVE
INSTALLATION
TOP VIEW
3.7
minimum clearance to combustibles and non-combustibles
MINIMUM CLEARANCES TO COMBUSTIBLES (FROM THE APPLIANCE) :
-
15” (38.1cm) to top/ceiling
-
7” (177.8mm) to sides
-
6”
(152.4mm) to bottom/fl oor
* On all vertical vent rises, only one inch clearance to the vent pipe is required.