
W415-1501 / E / 12.17.18
EN
23
framing
6.3
minimum clearance to combustibles
Framed Enclosure
Rear
- 0" (0mm) to stand-offs (rear)
Sides
- 6" (152mm) to sides
Ceiling
-
120" (304.8cm) from the base of the appliance (unless shielded
(enclosure)
with metal studs and cement board)
Ceiling
- 84" (213.4cm) from the base of the appliance
(in front of appliance)
Chimney
- 2" (51mm) (follow manufacturers instructions)
Hot air Gravity Ductwork Insulation
- 1" (25mm)
Solid Pack Chimney
Ceiling
- 120" (304.8cm) from the base of the appliance (unless shielded
(enclosure)
with metal studs and cement board).
Air Cooled
Ceiling
- 84" (213.4cm) from the base of the appliance
(enclosure)
6.4
minimum enclosure clearances
87"
(2210mm)
61
1
/
2
" (1562mm)
123" (3124mm)
50" (1270mm)
30
3
/
4
"
(781mm)
50" (1270mm)
15” (381mm)
required if
coiling liner
1/2" (13mm) Cement
board finishing
A
Shown with air intake liner coiled to create a cold trap.
OR
A minimum of 6" (152mm) is required to combustibles from
the side of the appliance. This is only if the intake liner is
routed below the 2" (51mm) projection of the outer casing
of the appliance. If the intake liner is routed vertically along
the side of the appliance then a spacing of 7" (178mm) is
required.
When framing in appliance, allow for fi nishing material thickness.
2 layers of 1/2" (13mm)
cement board needed to fi ll
gap A.
30
3
/
4
"
(781mm)
61
1
/
2
" (1562mm)
50" (1270mm)
21"
(533mm) MIN
6"
(152mm)
MIN