
EN
W415-4011 / A / 07.19.21
19
rough framing
3.1 header shield installation
The header shield provides the minimum clearance to the header. Use only non-combustible material for the
width of the appliance.
note:
Screw count varies by model.
note:
Remove the 4 screws securing the header shield.
Remove the shipping brackets by breaking them off
or folding them out of the way.
Once the header shield is removed, replace the 4
screws removed in step 1.
Secure the header shield with 7 screws (provided)
and remove the shipping brackets.
Bend the nailing tabs out 90º.
Nailing tab
1
2
3
4
Shipping bracket
Type 1 x 7