
W415-4020 / 08.09.21
EN
4
table of contents
1.0
general information
6
1.1
rating plate / lighting instruction
location
8
1.2
mobile home installation
8
2.0 dimensions
9
3.0
minimum venting requirements
10
3.1
typical vent installations
12
3.2
special vent installations
13
3.2.1 periscope termination
13
3.2.2 reduced vent clearance to
combustibles
13
3.3
converting from 5/8" to 4/7" venting
14
3.4
vent terminal clearances
15
3.5
vent application flow chart
16
3.6 definitions
16
3.7
elbow vent length values
16
3.8
horizontal termination
17
3.9
vertical termination
19
4.0 framing
21
4.1 framing
22
4.1.1 see-thru framing (BHD4ST_A)
22
4.1.2 peninsula framing (BHD4P_A)
22
4.2
minimum clearance to combustible
enclosures
23
4.2.1 see-thru (BHD4ST_A)
23
4.2.2 peninsula (BHD4P_A)
23
5.0
venting installation
24
5.1
horizontal installation
25
5.2
vertical installation
26
5.3
using flexible vent components 27
5.3.1 horizontal air terminal installation 28
5.3.2 vertical air terminal installation
29
5.3.3 appliance vent connection
29
6.0
electrical information
30
6.1
hard wiring connection
30
6.2
receptacle wiring diagram
30
6.3
electronic wiring diagram
30
6.4
battery back-up installation
31
6.5
wiring diagram
32
7.0
gas installation
33
7.1
access panel for gas line connection
33
8.0
nailing tab installation
34
9.0 operation
35
10.0 operating instructions
36
10.1 operating instructions - for your
safety read before operating
36
10.2 lighting instructions
36
11.0 finishing
37
11.1 shipping bracket
37
11.2 main safety barrier removal /
installation
37
11.3 end safety barrier removal /
installation (BHD4P_A only)
38
11.4 main door removal / installation 39
11.5 end door removal / installation
(BHD4P_A only)
40
11.6 control panel cover removal
40
11.7 installing combustible board
41
11.7.1 finishing support adjustment
42
11.8 minimum mantel clearances
43
11.9 non-combustible facing material 44
11.10 hearth pad installation
45
11.11 log placement
45
11.11.1
glowing embers
47
11.11.2
charcoal embers
47
11.11.3
charcoal lumps
47
11.12 glass media installation
48
11.13 logo placement
49
12.0 adjustments
50
12.1 pilot burner adjustment
50
12.2 venturi adjustment
50
12.3 restricting vertical vents
50
12.4 flame characteristics
51
13.0 maintenance
52
13.1 care of glass
53
13.2 annual maintenance
54
13.3 glass / door replacement
54
13.4 burner removal
55
13.4.1 log burner removal
55
13.4.2 glass burner removal
55
13.4.3 cradle burner removal
56
13.5 valve train replacement
56
14.0 replacement parts
57
14.1 BHD4P_A overview
58
14.2 BHD4ST_A overview
59
14.3 glass burner assembly
60
14.4 glass burner valve train assembly 61
14.5 log / cradle burner assembly
62
14.6 log / cradle burner valve train
assembly
63
15.0 accessories
64
16.0 troubleshooting
65
17.0 warranty
68
18.0 service history
69