background image

123 rue de Bellevue, 92100 Boulogne Billancourt 

France 

Tél : 33-(0) 1 41 41 00 02 - 

www.nano-sense.com

 

 
 

page 1/8 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

EP5000L air quality probe Installation manual 

 

 
 

Ver 

Date 

Modification / Update 

V1 

16/12/2019 

Initial

 

Version  

V2 

23/04/2021 

Update 

V3 

09/07/2021 

Disassembling the front panel 

V4 

10/10/2021 

Add recommendations and warranty  

 
 
 

Summary of Contents for LoRa EP5000L

Page 1: ... 0 1 41 41 00 02 www nano sense com page 1 8 EP5000L air quality probe Installation manual Ver Date Modification Update V1 16 12 2019 Initial Version V2 23 04 2021 Update V3 09 07 2021 Disassembling the front panel V4 10 10 2021 Add recommendations and warranty ...

Page 2: ... POSITIONING 3 3 DISASSEMBLING THE FRONT PANEL 5 4 FLUSH MOUNTING 5 5 SURFACE BOX MOUNTING RENOVATION 5 6 WIRING 5 7 INSTALLATION 6 8 CONNECTIONS 6 9 POWER ON 6 10 NFC 7 11 REMOVING THE FRONT PANEL OF AN INSTALLED PROBE 7 12 DISCONNECTION 8 13 RECOMMENDATIONS 8 14 WARRANTY 8 ...

Page 3: ...ency and energy savings for ventilation heating and cooling The probe is designed to ensure air quality it must be placed in the area of occupancy of the premise served by outlet vents on a wall at eyes level breathing human level between 1 5 and 1 8m Avoid drafts near openings blowing air doors outlet vents and dead zones niche shelves and curtains Avoid orthogonal walls corners of room in partic...

Page 4: ...ight combine without even taking into account the generally zenithal artificial lighting Consideration should also be given to the receptivity of the light sensor which is mounted vertically similar to our eyes Any work not in accordance with this documentation or changes to the device will invalidate all warranty claims ...

Page 5: ...m space free up to the bottom The space between screws shall be 60mm The height of the screws heads shall be 2mm max 5 Surface box mounting renovation Use the specific wall surface box To be ordered separately This box has 4 pre cut cable passages one on each side for wiring under trunking In case of a recessed cable the bottom of the box has a pre cut central pad Fix the box to the wall with four...

Page 6: ...ds flexible or rigid into the connector In case of a multi strand cable make sure to well twist them before inserting them In case of difficulty push the release tab Respect the polarity non destructive Make sure to respect the Up marking otherwise the temperature and humidity measurement will be jammed Screw the plate on the backbox Plug the front panel onto the plate Pay attention to the positio...

Page 7: ...llowed by 8 yellow flashes 8 Power supply board Red LED blinking 9 Multiple failures Alternation Red Blue 10 Perishable sensor reaching the end of life All LEDs blinking 11 No communication between front panel and probe after 30 seconds 10 NFC Used to recover and register LoRaWAN keys See commissioning manual and smartphone application 11 Removing the front panel of an installed probe There are 4 ...

Page 8: ...which it has been subjected This device is guaranteed against any manufacturing or material defect within the limits of the following provisions The warranty is strictly limited to the exchange or repair in the factory of parts recognized as defective after examination and control to the exclusion of any other compensation The warranty period offered by the manufacturer is one year and begins to r...

Reviews: