background image

Installation:

 

In case of any doubts, the installation should be carried out by qualified 

personnel.

1. 

Use a voltage tester to verify the voltage given on the phase conductor (L), 

usually black, brown or gray, 

before installing

 the product.

2. 

Switch off the power supply before installing the product. Start the ins-

tallation of the socket only after making sure that there is no voltage in the 
cables.

5

Reviews: