
P O R TA B L E A P P L I A N C E T E S T I N G
Please Note:
During testing of the machine with a portable appliance tester the insulation test will
show a failure due to the fitting of two VDRs between Live/Earth and Neutral/Earth.
These components have been fitted to safeguard against high voltage surges that may
occur on the mains supply to the machine and to comply with the EMC regulations.
To conduct an insulation test on this machine, the VDRs must be isolated from the
circuit first.
Ensure that the VDRs are reconnected after the insulation test has been completed and
before the machine is placed back into service.
The VDRs used have been specified and tested as safety critical components.
Summary of Contents for Time Crisis
Page 3: ......
Page 16: ...NAMCO EUROPE Ltd 500mm 230volt AC CPU 500mm 2310mm 3...
Page 32: ...Page 3 3 MAJOR COMPONENTS...
Page 65: ...Page 36 8 PARTS...
Page 69: ...Page 40...
Page 71: ...Page 42...