Page 25
8-2. AB Pedal Assembly
8-2-1.
Removing the AB Pedal Assembly
1)
Remove the four security screws (M6x25), and withdraw the assembly
forward.
2)
Disconnect the connector, and remove the assembly.
8-2-2
Replacing the Control Pots.
1)
Loosen the quadrant gear clamp screw, and remove the quadrant gear.
2)
Loosen the gear grub screw, and remove the gear.
3)
Replace the control pot.
Note:
When replacing the control pot
a.
Ensure that the potentiometer locating tag is engaged in the mounting plate
hole.
b.
Turn the potentiometer shaft almost fully clockwise before engaging the
quadrant gear.
After replacing the Control the game must be re-initialized
(See section 7-4
"Adjustments when Replacing Parts"
Summary of Contents for Ace Driver Victory Lap
Page 10: ...Page 10 4 MAJOR COMPONENTS...
Page 28: ...Page 28 9 PARTS...
Page 34: ...Page 34 10 SHEMATIC...
Page 35: ...Page 35...