
Page 49
5-2-3
I/O Test
1.
Select I/O TEST on the menu screen to test the I/O PCB, initialize the gun
accuracy and to test switches and gun solenoids, the following screen is
displayed.
2.
Use the Select Up/Down switch to choose the required item then press the Enter
button.
3.
Select EXIT and press the Enter button to return to the menu screen.
(a) Displays the position of the PCB DIP switches. Switches set to ON are displayed
in red. All switches should be OFF for normal operation.
(b) Indicates the communication status.
I/O
TEST
DIP
:
1234 [ON:RED]
LINK
: ON 2
LINK AS
: 1
(LEFT)
I/O PCB CHECK
(see
5-2-3-1)
GUN INITIALIZE
(see
5-2-3-2)
SWITCH TEST
(see
5-2-3-3)
SOLENOID TEST
EXIT
SELECT SW : CHOOSE ENTER SW : ENTER
}
(a)
(see 5-2-3-4)
(b)
n
o
i
t
a
c
i
d
n
I
s
u
t
a
t
S
n
o
i
t
a
c
i
n
u
m
m
o
C
2
N
O
l
a
m
r
o
N
F
F
O
n
o
i
t
a
c
i
n
u
m
m
o
C
o
N
G
N
d
e
v
i
e
c
e
R
a
t
a
D
n
w
o
n
k
n
U
n
o
i
t
a
c
i
d
n
I
g
n
i
t
t
e
S
l
a
n
r
e
t
n
I
)
t
f
e
L
(
1
t
n
o
r
F
e
h
t
m
o
r
f
d
e
w
e
i
V
s
a
n
e
e
r
c
S
t
f
e
L
)
t
h
g
i
R
(
2
t
n
o
r
F
e
h
t
m
o
r
f
d
e
w
e
i
V
s
a
n
e
e
r
c
S
t
h
g
i
R
Summary of Contents for 90500146
Page 2: ...Page 2 ...
Page 31: ...Page 31 2 MAIN COMPONENTS ...
Page 73: ...Page 73 ...
Page 74: ...Page 74 7 PARTS 7 1 Projector Cabinet Rear ...
Page 76: ...Page 76 7 2 Projector Cabinet Front ...
Page 80: ...Page 80 7 5 Gun Assembly ...