NADDOD S4600 Series Installation Instructions Manual Download Page 9

S4600-24X2CInstallation Instruction Manual

1 Product introduction

NADDOD Pte. Ltd.

8

1.4 Instruction on ports

1.4.1

Business ports

The business ports of S4600 series switches are shown in Form 1-2.

Form 1-2

Business ports of S4600 series switches

Product models

Interface type

Quantity

Description

S4600-24X2C

QSFP28

2

Use the category of QSFP28 optical modules
Use the category of QSFP+ optical modules

SFP+

24

Use the category of SFP+ optical modules

1.4.2 Management ports

Console port

The console interface uses a RJ-45 8-pin connector. To connect the console interface of switch to a
computer, we need adaptive cables of RJ-45-to-DB-9. It’s recommended to use the additionally
donated random network cables.

Figure 1-4

DB9 to RJ45 console interface connection cables

Refer to the following form for specific pins:

RJ45

Signal

Direction

DB-9

1

CTS (Clear To Send)

8

2

DSR (Data Set Ready)

6

3

RXD (Receive Data)

2

4

GND

---

5

5

GND

---

5

Summary of Contents for S4600 Series

Page 1: ...NADDOD S4600 Series Ethernet Switches Installation Instruction Manual...

Page 2: ...com Customer complaint hotline 400 0698 860 Address of headquarters of the Company 302 Building F1 Optics Valley Software Park Guanshan 1st Road East Lake High tech Zone Wuhan P R China Postcode 43000...

Page 3: ...ing symbols that may appear herein represent the following meanings Symbol Instruction Texts started with this symbol indicate that there exists potential risk which may cause person injured unless be...

Page 4: ...tle subtitle the third level title and Block adopt boldface Regular script Content such as warning and prompt adopts regular script Lucida Console The output information on the screen adopts Lucida Co...

Page 5: ...1 5 5 Indicator light of SFP port 11 1 5 6 Indicator light of QSFP28 port 11 2 Installation instruction 13 2 1 Preparation before installation 13 2 1 1 Safety warning 13 2 1 2 Pre installation check 1...

Page 6: ...hassis parameters 27 5 Switch OS Loading 28 6 Switch OS upgrade 30 7 Maintenance and troubleshooting 32 7 1 Loading failure handling 32 7 2 The user password is lost 32 7 3 Fault handling of power sys...

Page 7: ...res and QoS strategies and may provide medium and large scale campus network with high reliability high performance and manageable new intelligent campus network solutions These switches are also suit...

Page 8: ...of S4600 24X2C 1 Ground screws 2 reserved expansion slot 2 3 reserved expansion slot 1 4 Fan module 2 5 Fan module 1 6 PSU Power supplies PS2 7 PSU Power supplies PS1 1 Management Ethernet port MGMT 2...

Page 9: ...Use the category of QSFP optical modules SFP 24 Use the category of SFP optical modules 1 4 2 Management ports Console port The console interface uses a RJ 45 8 pin connector To connect the console i...

Page 10: ...tion programs on the terminal Ethernet ports used for management S4600 24X2C switches integrate out of band management Ethernet ports featured by 1000Base TX or 100Base T It s recommended to use the a...

Page 11: ...1 5 Instruction on indicator lights 1 5 1 Indicator light of system The working status of the switch can be preliminarily determined by the SYS status indicator light please see below for details Name...

Page 12: ...1 24 Green solid Port works in 25G mode and links up Green blinking Port works in 25G mode and has data receipt and sending Yellow solid Port works in 10G mode and links up Yellow blinking Port works...

Page 13: ...S4600 24X2CInstallation Instruction Manual 1 Product introduction NADDOD Pte Ltd 12 Name of indicator light State Instruction Dark No link...

Page 14: ...e venthole of the switch unblocked The switch can work normally only under correct voltage please confirm that the working voltage conforms to the voltage indicated by the switch To reduce the risk of...

Page 15: ...t and damage the circuit of switch too high temperature is more hazardous long term high temperature will accelerate the aging of insulating materials reduce greatly the reliability of switch and affe...

Page 16: ...ating current power socket should adopt single phase three wire power socket with protective earth wire PE to allow the filter circuit on the device to filter the interference of power grid effectivel...

Page 17: ...tion tools by themselves 2 2 Installation S4600 24X2C switches adopt two installation methods as follows Installing the front mounting brackets with rack rails Installing the devices to the desktop 2...

Page 18: ...ep 2 Fix the rail attached to the rack horizontally to proper positions of the rack Step 3 Take out the screws packed with front mounting bracket install one end of each front mounting bracket to the...

Page 19: ...e the switch on the clean workbench simply During the operation pay attention to the following precautions Guarantee the stability and good grounding of workbench Leave 10cm clearance around the switc...

Page 20: ...othly and steadily along the power supply slot until the power supply module is completely connected to the chassis Step 4 Fix the power supply to the switch with the fixing device of power supply Fig...

Page 21: ...ounding method Connect one end of yellow and green protective ground cables of switch to the ground terminal of switch and the other end to the wiring terminal along the grounding strip in the machine...

Page 22: ...Step 1 Connect the DB 9 cellular type plug of configuration cables to the serial ports of PC to configure the switch Step 2 Connect the RJ 45 end of configuration cables to the configuration interface...

Page 23: ...hown in the figure Figure 3 2 Create a new connection 2 Enter the new connection name e g Network in the connection instruction interface click the button of OK the system will pop up the interface as...

Page 24: ...k the button of OK the system will enter the hyperterminal interface shown in the following figure Figure 3 4 Hyperterminal interface 5 Select the Files Properties menu item in the dialog box of hyper...

Page 25: ...y us with the box otherwise it may be incompatible 3 3 Set port parameters SecureCRT Step 1 Install the software SecureCRT on the PC Step 2 Set the terminal parameters of SecureCRT 1 Click the button...

Page 26: ...F and click the button of Connect 5 Use the serial port to connect to PC you can see CLI shown in the following figure when you press the Enter key on the PC Figure 3 9 Serial port display window Plea...

Page 27: ...art the switch NADDOD Pte Ltd 26 Enter the command configure the Ethernet switch or check the operational state of Ethernet switch May enter at any time for help and please refer to the command line m...

Page 28: ...mainly including the following content Switch parameters 4 1 Chassis parameters The switch parameters of S4600 24X2C are shown as below Items Parameters Boundary dimension mm 440 width 360 depth 44 he...

Page 29: ...lock 533 MHz DDR clock 265 MHz 530 Mhz data rate Board descriptor tuple not found in eeprom using defaults DRAM 1 GB Clearing DRAM done Flash 2 GB BIST check passed Net octeth0 octeth1 Press ctrl b to...

Page 30: ...values Step 3 Run the program TFTP Server on the PC as the server and set the catalogue where the load files are located here the uBoot file to be upgraded is assumed to be u_boot_v1 0 bin Run the com...

Page 31: ...ror image files of software on the TFTP server to the boot folder of Flash of the switch Switch copy mgmt if tftp 10 10 29 160 SwitchOS ma v3 1 12 it r bin flash boot SwitchOS ma v3 1 12 it r bin Befo...

Page 32: ...heck whether the settings are correct Switch show boot images System image files list Current boot image version 3 1 12 Create Time Version File name 2011 01 01 15 03 30 3 1 11 SwitchOS ma v3 1 11 it...

Page 33: ...wn on the HyperTerminal and check whether there exist input errors etc Where there exist input errors please correct input errors and reload For example having entered wrong IP addresses of Server and...

Page 34: ...Partition table holds up to 128 entries First usable sector is 34 last usable sector is 468862094 Partitions will be aligned on 2048 sector boundaries Total free space is 417743981 sectors 199 2 GiB N...

Page 35: ...E reboot 7 3 Fault handling of power system The switch can judge whether there exists any fault in the power supply system of switch according to the PWR indicator light on the front panel when the po...

Page 36: ...ect settings of terminal parameters of terminal e g hyperterminal please carry out corresponding inspection Step 4 Fault handling of the terminal showing messy code If the configuration terminal shows...

Reviews: