38
Step 3.
Take the thin jib sheet from the box and tie one end to the block on the jib
track. Also connect a shackle to a block and put the thin jib sheet through
this block.
Step 4.
Go through the pulley on the jib track with the thin jib sheet.
Step 5.
Put the rest of the jib sheet in the bag in the trampoline. We will do the rest
when the spinnaker pole is being mounted in the rigging section.
1.8.5. Mast rotation
Step 1.
Take the rotator line from the box and tie one end to the side stay adjuster/
staymaster.
Step 5
Jib Sheet
Step 3 and 4
Mast rotation
Summary of Contents for F20 Carbon
Page 1: ......