Step 4.
Tie a block to the stay adjuster/staymaster with the red trampoline block tie
line. And take the tack line through the block.
Step 5.
Go under the trampoline with the tack line, going through the slot between
the trampoline lacing line and the trampoline next to the mast rotation cleat.
Step 6.
Take the tack release ring and tie the right end of the tack release line to it
(the end which was hanging under the trampoline).
With the tack line, go through the block under the front beam, then go
through the tack release ring, then go through the tack line cleat and then
through the block near the middle of the front beam.
Step 7.
Put the remaining line in the pocket of the trampoline, we will do the rest
later when the spinnaker pole is mounted in the rigging section.
1.8.4. Jib sheet
Step 1.
Attach the two jib sheet blocks to the rope on the third screw behind the
daggerboard casing on both hulls with a rope shackle.
Step 2.
Guide the jib sheet around the side stay and through this block.