
Page 43 of 46
ELECTRIC
SCREWDIVERS
Step 1:
Set the Unit 1 ~ Unit 3 condition (refer to
parameter condition)
1.
Set to Unit 1 when the first side is fastened
Program5 condition = maximum count as 4, maximum fastening torque (HQ)
15 kgf.cm, minimum fastening torque (LQ) 1 kgf.cm, and tool 1.
2.
Set to Unit 2 when the second side is fastened
Program8 condition = maximum count as 3, maximum fastening torque (HQ)
20 kgf.cm, minimum fastening torque (LQ) 5 kgf.cm, and tool 1.
3.
Set to Unit 3 when the third side is locked
Program10 condition = maximum count as 2, maximum fastening torque (HQ)
18 kgf.cm, minimum fastening torque (LQ) 3 kgf.cm, and tool 1.
4.
After complete setting parameters, press
to save data.
Press
to enter the “Controller and Job setup page”.