M1.2.LD2.NLFREN - 05122017

4

NL

Page 5

2

1.

Connect electricity supply. Make sure that the supply cable is at least 4mm  at 220V 
Note: Make sure that the facility supply voltage and frequency are the same as shown on
the equipment name plate.

2.

Connect to power supply AC 220V. Switch on the equipment. The LED display will show the
normal voltage as 220V.

3.

Set time and power according to the requirements of paint used for curing to achieve the
best curing result (usually, the values are set at 15 mins in time and 70% in power).

4.

Adjust the distance from heat source to paint surface (usually, keeping a distance of
45cm from the paint surface is the best).

5.

Protect the lamp against shocks and vibrations even when it is cold.

6.

During the curing process, the paint surface must be clean without water and impurities.

7.  Preferably do not touch quartz with bare hands. If grease or chemical compound have

been deposited on quartz, simply clean before lighting with cloth moistened with alcohol.

Install machine

Data displayed 
on screen

Set up temperature

Switch off

Connect input
 power

Switch on

30-60cm

ON

OFF

Set up time

 

ON

OFF

Heat source parallel 
to paint surface at a 
distance of 30-60cm

00

1

0

20

30

40

5

0

60

ON

5. Operation

Installeer het toestel

Sluit het netsnoer aan

Schakel het toestel in

Digitale display

Stel de tijd in

Houd de warmtebron parallel 

met de verfoppervlakte, en op 

45 cm afstand

Schakel het toestel uit na 

uitharding

Stel de temperatuur in

5  Bediening

1.  Sluit het netsnoer aan (kabel van tenminste 4 mm²).

2.  Schakel het toestel in, de LED display toont de normale spanning 220 V.

3.  Bepaal het vermogen en de temperatuur volgens het type verf (gewoonlijk worden de waarden 15 minuten en 70% 

vermogen ingesteld).

4.  Voor een optimaal resultaat, moet de zender parallel met de verfoppervlakte geplaatst worden.

5.  Stel de afstand tussen de warmtebron en het verfoppervlakte in. Een afstand van 45 cm is ideaal.

6.  Bescherm de lamp tegen schokken en trillingen, zelfs wanneer deze koud is.

7.  Tijdens het droogproces, moet de verfoppervlakte schoon zijn, vrij van water en onzuiverheden.

8.  Raak de kwarts bij voorkeur niet met blote handen. Als er vet of een chemische component op de kwarts afgezet is, reinig 

deze voor gebruik, gewoon met een doek met alcohol.

copyrighted 

document 

- all 

rights 

reserved 

by 

FBC

Summary of Contents for 829000301

Page 1: ...ur de peinture infrarouge Infrared paint dryer P 02 Gelieve te lezen en voor later gebruik bewaren P 06 Veuillez lire et conserver pour consultation ult rieure P 10 Please read and keep for future ref...

Page 2: ...evoer 230 V Input vermogen 2 x 1000 W Uitharding oppervlakte 800 x 800 mm Temperatuur 30 100 C Timer 0 60 min Lichtsterkte 10 100 Afmetingen 580 x 500 x 1600 mm Netto gewicht 19 kg 3 Installatie The s...

Page 3: ...rm voor de cassette op de kolom d Monteer de hijsbeugel op de kolom Deze controleert de opwaartse en neerwaartse bewegingen van de cassette 3 Installatie van de cassette a Neem de cassette voorzichtig...

Page 4: ...ON Installeer het toestel Sluit het netsnoer aan Schakel het toestel in Digitale display Stel de tijd in Houd de warmtebron parallel met de verfoppervlakte en op 45 cm afstand Schakel het toestel uit...

Page 5: ...at aan beide uiteinden van de cassette 4 Verwijder de vaste plaat aan beide uiteinden van de cassette 5 Draai de bevestigingsschroeven los en snijd de verbindingen af De lamp kan nu vervangen worden 6...

Page 6: ...ce d entr e 2 x 1000 W Surface de durcissement 800 x 800 mm Temp rature 30 100 C Minuterie 0 60 min Intensit lumineuse 10 100 Dimensions 580 x 500 x 1600 mm Poids net 19 kg 3 Installation The shortwav...

Page 7: ...s de support de la cassette sur la colonne d Montez la barre de levage sur la colonne Celle ci contr le les mouvements ascendants ou descendants de la cassette 3 Installation de la cassette a D ballez...

Page 8: ...Branchez le c ble d alimentation Allumez l appareil Affichage digital R glez la temp rature Maintenez la source de chaleur parall lement et 45 cm de la surface peinte teignez l appareil apr s durciss...

Page 9: ...sette 3 Enlevez les plaque aux deux extr mit s de la cassette 4 Enlevez la plaque fixe aux deux extr mit s de la cassette 5 Desserrez les vis de fixation et coupez les connexions La lampe peut pr sent...

Page 10: ...s Model LD2 Power supply 230 V Input power 2 x 1000 W Curing area 800 x 800 mm Temperature 30 100 C Timer 0 60 min Light intensity 10 100 Dimensions 580 x 500 x 1600 mm Net weight 19 kg 3 Installation...

Page 11: ...using the screws c Connect the support arm with the column for supporting the cassette d Connect the lifter with the column to control the up and down movement of the cassette 3 Installation of the c...

Page 12: ...e lighting with cloth moistened with alcohol Page 5 normal voltage as 220V 3 Set time and power according to the requirements of paint used for curing to achieve the best curing result usually the val...

Page 13: ...tte 3 Remove the plates form both ends of the cassette 4 Remove the fixed plate from both ends of the cassette 5 Loosen fixed screws and cut off connections the lamp can be replaced 6 Reverse the step...

Page 14: ...14 M1 2 LD2 NLFREN 05122017 NL FR EN 8 Onderdelen 8 Pi ces d tach es 8 Spare parts c o p y r i g h t e d d o c u m e n t a l l r i g h t s r e s e r v e d b y F B C...

Page 15: ...t diagram Page 8 Ov er C urrent P rotection S witc h P ower S w itch A C 2 20V N PC B 1 2 3 4 K1 K2 G1 G2 G2 K2 G1 K1 K1 G1 K2 G2 P ow er S w itch Temperature Regulation TIM ER ALAM P BLAM P AC 230V c...

Page 16: ...3 3 2013 Overeenstemt met de bestemming van de hierboven aangeduide richtlijnen met inbegrip van deze betreffende het tijdstip van de verklaring der geldende veranderingen R pond aux normes g n rales...