Mini Link Hydraulic System Operations Manual
Page | 18
Unit Overview – Material Manifold Controls
Setting Up the Unit
WARNING
Before performing maintenance of any kind, follow all warnings outlined in
this manual, follow all pressure relief procedures outlined, turn off all
electrical equipment associated with the system, and clean all tools of
grease or other material that can react with the material being pumped.
DANGER
Use proper safety gear, including gloves and safety glasses as
recommended by the manufacturer of your materials.
1. Connect air supply to system that is capable of providing 90 – 100 psi (6 – 7 bar) of clean, dry
air.
Note
When using the air driven mixer, a supply of 20 CFM is required.
2. Open the air manifold ball valve.
Fluid Pressure Gauge –
Displays the fluid
pressure for each of the
two components. These
are located at the
material manifold for
each material
Material Pressure Relief
Valve –
Used to relieve the material
fluid pressure back to the
source container
Material
Accumulator
Safety Relief Valve –
Automatically opens to
prevent excess fluid
pressure. The valve is set
to open at a preset
pressure and return the
material to the source
container