MAINTENANCE MANUAL
VC2E-MM-00
43
X Motor Belt
3. Hook the push-pull gauge into the hole of X
motor bracket, and pull toward yourself along
the direction parallel to the X-motor belt.
The pulling force is 2kgf.
1. Loosen the 4 retaining screws
securing the X-motor bracket.
4. Tighten the 4 retaining screws securing
the X-motor bracket.
5. Tighten the tension retaining screw.
2. Loosen the tension retaining screw
of X motor bracket.
The tension between the drum and X motor is 2 kgf.
Summary of Contents for ValueCut VC2-1300
Page 1: ...No VC2E MM 00 Cutting Plotter VC2 600 VC2 1300 VC2 1800 MAINTENANCE MANUAL...
Page 9: ...MAINTENANCE MANUAL VC2E MM 00 9 B Electronic and Electrical Assembly Recommend Service Parts...
Page 10: ...MAINTENANCE MANUAL VC2E MM 00 10 C Left End Assembly Recommend Service Parts...
Page 11: ...MAINTENANCE MANUAL VC2E MM 00 11 D Right End Assembly Recommend Service Parts...
Page 12: ...MAINTENANCE MANUAL VC2E MM 00 12 E X Motor Bracket and Belt Assembly Recommend Service Parts...
Page 13: ...MAINTENANCE MANUAL VC2E MM 00 13 F Carriage Assembly Recommend Service Parts...
Page 14: ...MAINTENANCE MANUAL VC2E MM 00 14 G Pinch Roller Assembly Recommend Service Parts...
Page 15: ...MAINTENANCE MANUAL VC2E MM 00 15 H Main Beam Assembly Recommend Service Parts...
Page 16: ...MAINTENANCE MANUAL VC2E MM 00 16 I Drum Assembly Recommend Service Parts...
Page 17: ...MAINTENANCE MANUAL VC2E MM 00 17 J Stand and Basket Recommend Service Parts...
Page 18: ...MAINTENANCE MANUAL VC2E MM 00 18 System Diagram and Wiring Diagram...
Page 51: ...MAINTENANCE MANUAL VC2E MM 00 51 Holder Encoder Test ENTER key ON OFF LINE key 3 seconds later...