![Mutek SLNA 145sb Installation Instruction Download Page 4](http://html1.mh-extra.com/html/mutek/slna-145sb/slna-145sb_installation-instruction_1860052004.webp)
14.
After rechecking that operation 13 is OK, replace back plate of the
transceiver with four screws.
15. Solder the red wire to the 12V stand-off of the main pcb as shown below.
16. Solder the orange lead to the 6.8V transmit stand-off as shown below.
17. Lead the cables neatly around the SLNA 145sb ensuring that none of the
cables or lead run across the board, and then replace antenna screening
tube in its previous position.
18. Replace anodized aluminum trims on each side of the transceiver.
19. Replace the battery compartment, taking great care not trap the red lead
to the preamplifier. Ni-Cd batteries when shorted do a pretty passable