background image

 

Section 80

 

1900003

 

2019-01-18 

 

Step 

Action 

When Enter is pressed to confirm, the controller will begin to load the 

configuration.  During the load, the amber LED will blink. When the load is 

finished, the amber and red LEDs will be blinking and the green LED will be on 

steady.  The loading process takes approximately 10 to 15 seconds. 

Remove the thumb drive, and the controller will exit out of the bootload mode. 

Power cycle the controller to return to normal operations.   

 

NOTE: 

If the loading process is interrupted, or the power or thumb drive are 

removed, the older method (detailed below) must be used.  

 

 

MPC20 & MPC10 Older Method 

Using this method, PowerCore products need to be put in the bootload mode to receive 

configurations.  Follow these steps: 

Step 

Action 

Hold down both the back and down arrow buttons while powering up the 

controller.  

 

 

 

 

Continue to hold both buttons until all three LEDs are blinking. 

 

 

 

Once in bootload mode, insert the thumb drive.  In a few seconds, the thumb 

drive LED will start blinking.  The loading process takes approximately 10 to 15 

seconds. 

Summary of Contents for PowerCore MPC-20

Page 1: ...1900003 Section 80 2019 01 18 Murphy PowerCore Configurations Installation Manual...

Page 2: ...designs at any time The latest version of this manual can be found at enovationcontrols com BEFORE BEGINNING INSTALLATION OF THIS MURPHY PRODUCT Read and follow all installation instructions Observe a...

Page 3: ...ments 5 PowerCore Products 5 USB Configuration Loading Methods 5 USB Thumb Drive 5 Necessary PowerCore Harnessing for USB Loading 5 Loading Configurations with USB 6 MPC20 MPC10 Older Method 7 CAN Ove...

Page 4: ...Section 80 4 1900003 2019 01 18 THIS PAGE INTENTIONALLY LEFT BLANK...

Page 5: ...ight click on removable disk click on Format Check under File System to verify the format is compatible Necessary PowerCore Harnessing for USB Loading MPC20 Along with the 40000554 3 90 pin whip harne...

Page 6: ...figuration is an older version that choice is not there and the older method must be used MPC20 MPC10 LOCAL METHOD The file name can be customized for easy reference but the file must have gciBin as t...

Page 7: ...ntroller to return to normal operations NOTE If the loading process is interrupted or the power or thumb drive are removed the older method detailed below must be used MPC20 MPC10 Older Method Using t...

Page 8: ...essing for CAN Loading The 40000625 programming kit or equivalent is required to load programs in to the TEC 10 This same kit can be used on the ML PowerCore panels Loading Configurations with CAN Ste...

Page 9: ...01 18 Step Action 6 Click on Load Firmware This process takes about 3 to 4 minutes During the load the amber LED will blink on the controller When the load is finished the controller will reset and r...

Page 10: ......

Reviews: