AI81.8
CONTEMPORARY WATER COOLERS
I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
ELECTRIC DRINKING FOUNTAINS
Revised:
03/29/2021
7020-007-001
RVB
2. Carefully remove Drinking Fountain and Chiller mounting frame from packaging to prevent damage.
1. Provide wall opening as indicated in Rough-in sheet. Provide structural support around opening for frame
anchoring if required.
3.
Recheck all water and drain connections with water flowing through system.
4.
Install Removable Access Panels to fixture. Secure with hardware provided.
5. Place the Chiller Unit onto the basepan of the frame assembly. Make up electrical connections as required.
Refer to A910.8 Chiller manual 7020-978-001 for complete Chiller installation information.
INSTALLATION:
6. Position the top of the Fountain assembly over the Frame S-clip just below the Chiller basepan and engage
while securing bottom tabs to Frame assembly with #10-32 screws and washers provided. Scews must
thread into captive nuts behind Frame tab. Tighten screws to pull the Fountain flush with the wall.
7. Assembly 3/8” OD Tube x 3/8” Tube Y-Strainer assembly to Chiller inlet. Ensure Y-strainer assembly is
orientated in the proper direction of flow. Refer to arrow on strainer.
9. Make-up Waste connection to drinking fountain 1-1/4” OD connection.
2.
Air within the Fountain or the structure supply piping will cause an irregular outlet stream until purged out by
incoming water.
1.
Before assembling Access Panels to fixture, but after thoroughly flushing the supply line and connecting it to
the fixture, turn on building water supply and check all connections for leaks.
8. Make up 1/4” OD Tube riser connections to 1/4” OD x 3/8” OD push-in fitting on the Chiller outlet and run
riser tube to connections Fountain and optional Bottle Filler. The 1/4” OD Riser tube from Chiller to Fountain
should be insulated to prevent condensation and maintain cool water temperature.
3. Insert and center mounting frame into the rough-in blockout, with sides, top and bottom flange against
finished wall. Level and secure using mounting hardware provided by the installer. Verify if level and shim if
necessary.
4. Secure Frame to wall through sides top and bottom using anchoring hardware by others.
10. After thoroughly flushing supply line, connect water supply to 3/8” OD Tube connection on Chiller.
START UP: