To re-pipe a single non-pressurized unit to pressurized, you
will have to move the water supply tubing around, with “
NO
”
additional tubing needed. Before performing this task you
MUST SHUT OFF THE WATER SUPPLY
, and disconnect
all supply connections.
RE-PIPING FROM NON-PRESSURIZED
TO PRESSURIZED (FOR -GF & -BF ONLY)
STEP 3:
From the outlet of the cartridge assembly, connect to
the bubbler.
STEP 1:
Starting with the supply line coming from the wall,
connect to the inlet of the evaporator assembly.
STEP 2:
From the outlet of the evaporator assembly, connect to
the inlet of the cartridge assembly.
I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
CONTEMPORARY WATER COOLERS
I N S TA L L AT I O N / M A I N T E N A N C E I N S T R U C T I O N S
WATER COOLERS
A171.8FGVR
Page 7 of 15
Revised:
07/18/18
7020-927-001
MURDOCK MFG. •
15125 Proctor Avenue • City of Industry, CA 91746 USA
Phone 800-453-7465 or 626-333-2543 • Fax 626-855-4860 • www.murdockmfg.com
Member of
Wall Supply Connection
17" Water Supply Tubing
Evaporator Inlet Connection
13" Water Supply Tubing
Bubbler Connection
Cartridge Assembly
Outlet Connection
Cartridge Assembly
Inlet Connection
Evaporator Outlet Connection
To Bottle Filler or Glass Filler
Add 1
4
" Tee for Both BF or GF