Murdock A1311408F Installation & Maintenance Instructions Manual Download Page 4

 

1.   Waste P-Trap, Water Supply Service Angle Stop Valve and 2” x 4” Electrical Plug-In Receptacle to be supplied 

by others in accordance with local codes. A metallic p-trap (by others) must be used for the drain connection.

6.   All burrs must be removed from outside of cut tubes before inserting into coupler or other components.

IMPORTANT:

TROUBLE SHOOTING:

IMPORTANT: BEFORE MAKING ANY OF THE REPAIRS LISTED, MAKE SURE THE WATER COOLER IS 
DISCONNECTED FROM THE ELECTRICAL SUPPLY AND THE WATER SUPPLY VALVE IS SHUT OFF..

5.   Do NOT solder copper tube when inserted into the coupler as damage to the o-ring will result.

8.   This unit must be grounded per the requirements of applicable electrical codes.

3.   Water supply is 3/8” Outside Diameter copper tube. Waste is 1-1/4” Outside Diameter.

7.   Power supply must be identical in voltage, cycle and phase to that specified on the cooler data plate. 

Electrical outlet and furnished power cord with plug must be used to supply power to fixture. Do NOT wire 
compressor directly to the power supply.

9.

   Warranty is voided if installatio

n is not made following current Acorn Engineering installation instructions 

and if components are assembled to the fixture that is not approved by Acorn Engineering.

10. Fixture operates within water pressure range of 20 to 105 psig. Acorn Engineering will not warranty fixtures 

damaged when connected to supply lines with flow pressure lower than 20 psig or higher than 105 psig. A 
pressure regulator must be furnished by others on supply line if inlet pressure is greater than 105 psig.

11. Due to cold waste water, Acorn Engineering recommends that p-trap supplied by installer be insulated to 

prevent excessive condensation.

12. Per UPC 609.10-

 All building water supply systems in which quick acting valves are installed shall be provided 

with devices to absorb the hammer caused by high pressure resulting from the quick closing of the valve. 
These pressure-absorbing devices shall be approved mechanical devices. Water pressure-absorbing devices 
will be installed as close as possible to the quick closing valve.

2.   Provide 4” minimum clear space on fixture sides to allow for proper ventilation through cabinet louvers.

4.   Completely flush supply lines of all foreign debris before connecting to fixture. Water cooler designed to not 

affect taste, odor, color, or sediment. Optional water filter (Wf1) is available should any of these problems 
arise from the water supply.

         b. Cold Water Thermostat – The water temperature can be adjusted using a slotted screwdriver

   and turning clockwise to make colder and counterclockwise to make warmer.

1. Adjustments 

a. Cartridge – The water flow can be adjusted through the pushbutton using a straight blade
   screwdriver and turning clockwise to increase flow and counterclockwise to decrease flow.

          c. Bubbler Stream – Bubbler can be rotated slightly to direct the stream backwards or forwards.

   Adjust the stream to minimize splashing. Splashing may occur from bubbler stream if the unit
   is not level. Shim lower mounting points, if necessary, to level cooler.

         IMPORTANT : ASSUREZ-VOUS QUE LA FONTAINE D'EAU POTABLE RÉFRIGÉRÉE SOIT 

DÉBRANCHÉE DE LA PRISE DE COURANT MURALE ET QUE LE ROBINET D'ALIMENTATION D'EAU 
SOIT FRMÉ AVANT D'EFFECTUER LES RÉPARATIONS NÉCESSAIRES.

 

A311.8

Page 4 of 9

Revised: 

09/01/20

7020-919-001

MURDOCK  MFG.  • 

15125  Proctor  Avenue  •  City  of  Industry,  CA  91746  USA 

Phone  800-453-7465  or  626-333-2543  •  Fax  626-855-4860  •  www.murdockmfg.com

Member of

 

CONTEMPORARY WATER COOLERS

 

I N S TA L L AT I O N / M A I N T E N A N C E  I N S T R U C T I O N S

 WATER COOLERS

 

Summary of Contents for A1311408F

Page 1: ...ch unit and disregard or non compliance with these instructions will constitute an abnormal use condition and void the warranty Stainless steel must be protected on job site during construction and must be properly maintained after the water has been introduced into the water cooler or drinking fountain or Murdock s limited warranty is void LIMITED EXPORT WARRANTY One year on parts only LIMITED WA...

Page 2: ...etallic coupler is furnished with this water cooler to meet this requirement A311 8 Page 2 of 9 Revised 09 01 20 7020 919 001 MURDOCK MFG 15125 Proctor Avenue City of Industry CA 91746 USA Phone 800 453 7465 or 626 333 2543 Fax 626 855 4860 www murdockmfg com Member of AIR FLOW GENERAL NOTES 1 ALL DIMENSIONS ARE IN INCHES MM 2 ALLOW 4 INCHES 102 MM MINIMUM CLEARANCE PER SIDE FOR VENTILATION 3 DIME...

Page 3: ... 1 4 O D p trap waste connection Waste p trap by others START UP 4 Anchor the water coolers to the wall at the lower mounting points in each back panel Shim lower mounting points to level unit if necessary 6 Plug water cooler in to electrical outlet and make sure unit begins to function 5 With power still NOT connected carefully manually rotate cooling fan to insure proper clearance and free fan a...

Page 4: ...densation 12 Per UPC 609 10 All building water supply systems in which quick acting valves are installed shall be provided with devices to absorb the hammer caused by high pressure resulting from the quick closing of the valve These pressure absorbing devices shall be approved mechanical devices Water pressure absorbing devices will be installed as close as possible to the quick closing valve 2 Pr...

Page 5: ...g condition in which the water will become frozen inside the evaporator coil This indicates a refrigeration problem or thermostat failure in which case the water cooler needs to be checked by a qualified technician 2 Compressor Does Not Run a Check the electrical receptacle for power and correct voltage The incoming voltage must be within 10 of the rated voltage on the serial nameplate b The cold ...

Page 6: ...ess steel They can scratch easily and should only be cleaned using a clean soft cloth and mild soap with water or a mild glass cleaner CARTRIDGE VALVE PARTS BREAKDOWN STANDARD CARTRIDGE VALVE PARTS BREAKDOWN ITEM PART NUMBER DESCRIPTION 1 7000 050 001 Valve Cartridge Assembly 2 7000 060 000 Valve Cartridge 3 7000 053 199 Jam Nut ITEM PART NUMBER DESCRIPTION 1 2 3 7000 000 001 7000 060 001 0401 015...

Page 7: ...e PE tubing to remove from the push in fitting TO CUT TUBE Cut to fit length of 1 4 PE tubing and remove any burrs or sharp edges Ensure that the outside diameter is free from score marks Tube ends should be square 1 Firmly and fully insert the tubing end into the push in fitting up to the tube stop located approximately deep INSERTING THE TUBE COLLET COLLET O RING O RING TUBE STOP COLLET COLLET C...

Page 8: ... 15 28 27 18 28 27 18 NOTE Flow Restrictor Only Available With Low Flow Bubbler 29 A311 8 Page 8 of 9 Revised 09 01 20 7020 919 001 MURDOCK MFG 15125 Proctor Avenue City of Industry CA 91746 USA Phone 800 453 7465 or 626 333 2543 Fax 626 855 4860 www murdockmfg com Member of CONTEMPORARY WATER COOLERS I N S TA L L AT I O N M A I N T E N A N C E I N S T R U C T I O N S WATER COOLERS ...

Page 9: ... 000 FAN MOTOR 7012 062 001 FAN MOTOR 220V 7005 506 020 SIDE PANEL GRAY 7005 511 199 SIDE PANEL STAINLESS STEEL 0124 056 000 8 x 3 8 LONG PHILLIP PH SHEET METAL SCREW 7003 250 000 COLD CONTROL 7003 120 001 EVAPORATOR ASSEMBLY 7004 407 199 BACK PLATE 7004 408 199 HANGER BRACKET 7000 021 001 Y STRAINER 7000 032 001 DRAIN TUBE ASSEMBLY 7000 005 199 DRAIN ADAPTER 7000 006 000 FLAT DRAIN ADAPTER GASKET...

Reviews: