© Munters Corporation , July 2018
4
QM1115r0
1.1 Parts List
Unpacking the Equipment
1.
Before beginning installation, check the overall condition of the equipment. Remove packing materials, and examine all
components for signs of shipping damage. Any shipping damage is the customer's responsibility and should be reported
immediately to your freight carrier.
Each Box Includes Parts to build 6 Inlets:
Each MWI Inlet Requires:
ID
Qty.
Cat. No.
Description
1
1
Left Side End Cap, PL
2
1
Right Side End Cap, PL
3
2
Top/Bottom Header, PL
4
1
Brush Seal
5
2
2¹⁄₂” x 3⁷⁄₈” L-Screw
6
1
Door, Curved, PL
7
1
¹⁄₂” x ¹⁄₂” Mesh Guard, GAW
Optional Lift Kit (FA1500)
A
1
AC0211/AC0212 Azuma Bolt and Nut, PL
B
1
KS2601
6 GA. x 1.875” Open Eye Lag Screw, ZP
C
1
AC1054
Nylon Guide Link
D
1
AC1039
³⁄₁₆” Dia. Cable Clamp, ZP
E
1
AC1009
¹⁄₈”x36”L. Braided Polyester Lift Line
[A]
[B]
[C]
[D]
[E]