
FORM: QM1110M
Rev. 1, November 2013
Page 7 of 12
Munters Corporation
4215 Legion Dr. Mason, MI 48854-1036 USA
Ph: +1 517 676-7070 Fax: +1 517 676-7078
www.munters.us
Step 4
Apply bead of caulk around top of inlet as shown in
Figure 4A
. Position inlet into the framed opening and
attach inlet to framing using (8) Hex Head Screws
[A] provided.
See Figure 4B
. Be careful not to over
tighten as this may pull the frame out of shape.
Step 5
To ensure an airtight fi t, caulk around outside of
framing and inlet.
Step 6
Proceed to routing the main actuator cable or rod
through the holes in the inlet frame. It is required to
utilize a spring or weight on the actuator cable end
opposite the actuator. Once the cable is routed and
the actuator is in the open position, begin connecting
the lift lines from each inlet door to the actuator cable
using Cable Clamp [B] provided.
See Figure 5.
Step 7
After lift lines for all inlets are connected and doors
are adjusted as needed, caulk the hole in the door for
the lift line, to prevent air leaks.
See Figure 5.
Inlet Door
Cable Clamp [B]
Lift Line
Lift Line Guide
Azuma Bolt and Nut
Latch
Inlet Frame
Rod or cable by other
To Actuator
Figure 5
Figure 4B
Insulation Stop
Hex Head Screw [A]
50,8 mm
Framing
Inlet Frame
Figure 4A
Inlet Frame
Bead of Caulk
Eye Bolt
Hole for Lift Line