
8
GAS-FIRED BOILER
Boiler Manual
PART 3: PREPARE BOILER LOCATION
CAUTION
When preparing the boiler location, make sure the area where you are placing the boiler is level. In order
for the condensate to flow to the location of the condensate hose, the boiler must be slightly pitched
back to assure proper flow direction. The Munchkin Boiler comes equipped with leveling feet. Should
you find the floor beneath the boiler is uneven, with a wrench, adjust the leveling feet so the boiler is
pitched back at 1/8” per foot
INCORRECT
CORRECT
A. BOILER LOCATION SHOULD BE LEVEL
Summary of Contents for Gas-Fired Hot Water Boiler
Page 11: ...10 GAS FIRED BOILER Boiler Manual DIMENSIONS 80M 140M 199M Figure 2 2 Figure 2 3...
Page 52: ...51 GAS FIRED BOILER Boiler Manual PART 9 FIELD WIRING CONTINUED Fig 9 5...
Page 77: ...76 MAINTENANCE NOTES...
Page 78: ...77 MAINTENANCE NOTES...
Page 79: ...78 MAINTENANCE NOTES...
Page 80: ...2007 Heat Transfer Products Inc www HTproducts com LP 185 REV 12 10 07...