INSTALLATION CHECKLIST & REQUEST FOR AUTHORIZED START-UP ENGINEER
CUSTOMER: _______________________________________
JOB NAME: ________________________________________
JOB LOCATION: _____________________________________
CUSTOMER ORDER NO.: ________________________________
CHILLED WATER
Yes
No
N/A
Piping complete and connected to Multistack Units.
q
q
q
Water system filled and vented.
q
q
q
Pumps installed (Rotation checked).
q
q
q
Recommended strainers installed.
q
q
q
Controls (3-way valves & by-pass valves, etc.) operable.
q
q
q
Water system operated and flow balanced to meet unit design requirements.
q
q
q
Strainers checked for unusual debris.
q
q
q
Flow or differential pressure switch installed.
q
q
q
CONDENSER WATER
Yes
No
N/A
Piping complete and connected to Multistack Units.
q
q
q
Cooling tower flushed, filled and vented.
q
q
q
Pumps installed (Rotation checked).
q
q
q
Recommended strainers installed.
q
q
q
Controls (3-way valves and by-pass valves, etc.) operable.
q
q
q
Cooling tower fans wired and operable.
q
q
q
Condenser water system operated.
q
q
q
Condenser & evaporator strainers must be checked, cleaned and free of debris.
q
q
q
Flow or differential pressure switch installed.
q
q
q
ELECTRICAL
Yes
No
N/A
Power wiring complete and in accordance with nameplate rating on Multistack unit and prepared for connec-
tion in accordance with installation manual.
q
q
q
NOTE
: No power is to be applied to unit prior to inspection by Multistack engineer.
All interlock wiring complete between control panel and complies with Multistack specifications and with
applicable codes.
q
q
q
MISCELLANEOUS
Yes
No
N/A
Thermometer wells, thermometer gauges, control, etc. installed.
q
q
q
A minimum system load of 50% of total building load is available for testing and
adjusting controls.
q
q
q
We understand that authorized representatives of the installing electrical and piping contractor must be available during the start-up period and that
coordination is our responsibility.
We further understand that the services of Multistack Authorized Start-up Engineer will be furnished for a period of not more than sixteen (16) consecutive
normal working hours and we agree that a charge for time and expenses will be made by Multistack if services are required for longer than sixteen (16)
consecutive normal working hours or if repeat calls are required through no fault of Multistack.
Signed
Title
Company Name, Company Location and Company Telephone
Job Location Telephone