Installation Notes: 

 

 

Piping such as PEX, steel, copper, or PVC can be used with the Multiaqua system. 
Check  local  building  codes  for  material  conformation.  Care  must  be  taken  when 
using PVC as the presence of propylene glycol may destroy plastics. Pressure drop 
data for the selected piping material is readily available and should be used. Should 
the  Multiaqua  chiller  be  installed  using  an  existing  steel  (ferrous  metal)  piping 
system,  dielectric  fittings  must  be  used  at  the  chiller  and  air  handler.  The  factory 
supplied wye strainer will capture particles of rust and sediment inherent with steel 
piping and should be checked and cleaned after initial start up. The strainer should 
be  inspected  and  cleaned  as  part  of  regular  maintenance  during  the  life  of  the 
chiller.

 

 

 

Any  piping  used  to  conduct  liquid  solution  must  be  insulated  in  accordance  with 
local  and  national  mechanical  codes.  Information  on  insulation  installation  and 
application can be obtained from Armacell web site at www.armacell.us/home. For 
future  servicing  of  the  chiller  and  air  handlers,  it  is  suggested  that  shut-off  ball 
valves be installed at the chiller and air handler(s). If ball valves are used, they can 
double  as  balancing  valve  (s)  in  the  supply  piping  at  each  chiller  and  air  handler. 
Chiller shut-off valves should be attached at the chiller connections with unions.

 

 

 

The  air  handlers  are  to  be  controlled  with  electrically  operated,  slow-opening 
valves, circulators, or motorized zone valves. A thermostat can operate the valves. 

 

 

Bypass valves, should be installed between the supply and the return chilled liquid 
solution supply  pipes at  a convenient location to the installation. The bypass valve 
operates  to  bypass  liquid  solution  between  the  supply  and  return  chilled  liquid 
solution lines. In the event  air handler valves shut  down, the  bypass  valve is  set to 
open  and  bypass  liquid  solution  between  the  supply  and  return  lines  relieving 
pressure  and thereby eliminating the possibility of pump  cavitations. To  adjust the 
valve,  run  the  system  with  one  air  handler  solenoid  actuated.  De-energize  the 
solenoid  valve  (at  this  point  no  liquid  solution  will  be  flowing  through  the  air 
handlers),  and  adjust  the  bypass  valve  to  relieve  pressure  between  the  supply  and 
return piping.

 

 

 

Bleed  ports  will  be factory installed  on all Multiaqua  air handlers. Bleed  ports  are 
opened to eliminate  air trapped in the  air handlers  after filling the syste m  with the 
liquid solution and before chiller operation. 

The field installation of an additional 

air bleed port at the highest point in the system is also recommended.

 

 

 

The  minimum  liquid  solution  content  in  the  5  ton  chiller  system  (piping,  chiller, 
and  air  handlers),  is  25  U.S.  gallons.  Estimate  the  system  liquid  solution  content. 
Should  the  system  have  less  than  25  gallons  of  liquid  solution  content,  a  chilled 
liquid  solution  storage  tank  must  be  in  stalled.  The  tank  stores  enough  chilled 
liquid  solution  to  prevent  frequent  chiller  compressor  cycling  at  light  load 
conditions.  It  also  prevents  chilled  liquid  temperature  swings  at  higher  load 
conditions  when  the  chiller  compressor  is  waiting  to  cycle  on  the  time  delay 
control.

 

Page 15 of 28

 

 

Summary of Contents for MAC-036HE

Page 1: ...Rev 1 1...

Page 2: ...System Faults 10 Refrigeration System Operation 10 Description of Refrigerant Components 11 Description of Piping Components 12 Layout Design 13 Banked Chiller Configuration 14 Installation Notes 15 1...

Page 3: ...TION RELATED INFORMATION Website information addresses are supplied throughout this manual for piping and accessory information The plumbing industry also has pressure drop information on ferrous and...

Page 4: ...uld void the heat exchanger warranty Cooling Load Diversity Equipment sizing for a chilled liquid solution system can utilize Cooling Load Diversity Diversity is described as the actual amount of cool...

Page 5: ...d with all additional equipment that is required to make up the system prior to installation Retain this manual for future reference Separate and independent power supplies and disconnects must be pro...

Page 6: ...ller cabinet In coastal areas locate the chiller on the side of the building away from the waterfront Elevate the chiller adequately to ensure that it does not sit in standing water or where water can...

Page 7: ...with the low and high pressure switches Should the flow switch open the timer can only be reset by opening and closing the chiller s line voltage disconnect System Delay Timer The refrigerant timer is...

Page 8: ...low switch is position sensitive The arrow on the switch must point in the direction of liquid solution flow Maximum flow is not to exceed 14 4 GPM Compressor Contactor The compressor contactor energi...

Page 9: ...e refrigerant short cycle 5 minute delay timer to open its contact before resetting to the closed position This will de energize the compressor Power fluctuations will also initiate the 5 minute time...

Page 10: ...id solution flow etc High Pressure Switch Opening Should the compressor discharge pressure go high enough to open the high pressure switch the compressor and condenser fan motors will shut down Check...

Page 11: ...per and stainless steel design Refrigerant and liquid solution are channeled through the narrow openings between the plates and flow in opposite directions The counter flow design and fluid turbulence...

Page 12: ...n in the system The air scoop eliminates air entrained in the liquid solution Part Number 1500 1 2 2 Gallon EX 3000 125 4 4 Gallon Liquid Solution Bypass Valve The liquid solution bypass valve relieve...

Page 13: ...onents piping system and air handlers while maintaining the necessary flow rates in gallons per minute Pump capacities in gallons per minute and pressure drop feet of head are listed in Table 1 An adj...

Page 14: ...Banked Chiller Configuration Installing Multiaqua chillers in parallel is recommended Piping chillers in series is not recommended Page 14 of 28...

Page 15: ...t can operate the valves Bypass valves should be installed between the supply and the return chilled liquid solution supply pipes at a convenient location to the installation The bypass valve operates...

Page 16: ...g less than the recommended Propylene Glycol percentage content voids equipment warranty Cold ambient mitigation is mandatory Failure to do so will result in the damage to components property damage a...

Page 17: ...efore filling the system with liquid solution Propylene Glycol and water pressure test the piping system with compressed air Testing should be done at a maximum of 50 PSI The system should hold air pr...

Page 18: ...air move across it allowing the circuit to be interrupted Continue to bleed air out of the system at the highest points before resetting the pump bypass timer Open and close the power supply switch to...

Page 19: ...MAC 36HE 048HE 060HE 1 Ladder Wiring Diagram 208 230 1 50 60 Page 19 of 28...

Page 20: ...MAC 36HE 048HE 060HE 1 L Ladder Wiring Diagram With Low Ambient Kit 208 230 1 50 60 Page 20 of 28...

Page 21: ...MAC 36HE 048HE 060HE 2 Ladder Wiring Diagram 208 230 3 50 60 Page 21 of 28...

Page 22: ...MAC 36HE 048HE 060HE 2 L Ladder Wiring Diagram With Low Ambient Kit 208 230 3 50 60 Page 22 of 28...

Page 23: ...MAC 36HE 048HE 060HE 3 Ladder Wiring Diagram 380 460 3 50 60 Page 23 of 28...

Page 24: ...MAC 36HE 048HE 060HE 3 L Ladder Wiring Diagram With Low Ambient Kit 380 460 3 50 60 Page 24 of 28...

Page 25: ...Notes Page 26 of 28...

Page 26: ...306 Hagood Street Easley SC 29640 Ph 864 850 8990 Fax 864 850 8995 www multiaqua com For Technical Assistance 1 855 THNK WTR 1 855 846 5987...