Fan coil unit - CFFWA4P Series
Figure 8
Figure 9
Section 5c) ELECTRICAL AND FRESH AIR INSTALLATION OF UNIT (Continued)
1. Make electrical supply connections in accordance with all code
requirements. Low voltage (24vac) and Line voltage connections
are located under the side cover on the left side of the unit when
facing in the direction of the airflow. See figure 8
2. Terminal strip configuration is
pictured here in Figure 9
3. Fresh air connections should be made at this time if applicable. There are no factory
predetermined connection locations for fresh air on the unit cabinet. Connections can be made
in the field by the contractor to the back or top of the unit into the fan compartment.
Contractor should supply and field fabricate boots for these connections to meet job
requirements as needed.
This source of fresh air MUST BE DELIVERED TO THE UNIT UNDER POSSITIVE PRESSURE as
these units are not rated for static pressure.
This source of fresh air must be turned off when the unit is not in operation to prevent
the introduction of unconditioned air into the conditioned space.
This source of fresh air must be filtered before delivery to the fan coil unit.
4. Reinstall filter grilles with the tow (2) screws in each section removed earlier. DO NOT OVER
TIGHTEN.
5. Unit is now ready for contractor start-up procedures and recording of benchmark data according
to all local and national requirements.