![Multi-Link IP Power Stone 4000 User Manual Download Page 20](http://html1.mh-extra.com/html/multi-link/ip-power-stone-4000/ip-power-stone-4000_user-manual_1854009020.webp)
-18-
Appendix C: Glossary
Set
the
Off/On
delay
for
the
Outlet.
This
applies
to
both
outlets.
Power
‐
on
delay
between
Outlet
1
and
Outlet
2
Set
the
power
on
interval
between
Outlet
1
and
Outlet
2.
Set
to
0
to
disable
this
feature.
Default
is
set
to
10
seconds.
4.2.2
Schedule
This
option
allows
the
user
to
schedule
the
power
on
/
off
/
reset
for
each
of
the
two
outlets.
i.
New
Schedule
Event
Outlet
Select
to
schedule
an
event
for
either
both,
Outlet
1
or
Outlet
2.
Outlet
Action
Select
action
to
apply
to
above
Outlets.
To
turn
On,
Off
or
Reset.
Date
(yyyy/mm/dd)
Select
the
event
frequency
for
the
above
outlet;
a.
Once
(the
current
date
is
automatically
entered)
or;
b.
Reoccurring
on
a
particular
day,
or
a
daily
event.
Time
(hh:mm)
Enter
the
time
in
24hr
format.
A
total
of
20
schedules
can
be
assigned.
Note: This feature only works if BOTH Outlets are in the ON state, when power resets.
If the Outlet is OFF, it will not “Reset”.