Copyright
©
Mugin Tech Ltd
www.muginuav.com
12
A few key points to remember:
When installing the servos remember to properly center them with a servo tester before installing
the control horns. The soldering between the servos and wire extensions should be shiny and firm.
Remember to place the heat shrink on the wires before soldering. If using D-Sub connectors
remember proper wire mapping to avoid reverse polarity.
Motor Installation
Build tip: The motor mount has a small angular offset. When installing, make certain the motors
lean outward and not inward towards the plane.
Aluminum rivets and floating lock nuts will be used for the motor mounts. At the time of releasing
the manual, this cutting process will no longer be required. If you have purchased a Mugin in the
past and would like a 3D printed cutting guide, please send us a message to [email protected] .
The process is straight forward and can use the following 5 steps to complete the process.