Mueller U-20806 Installation Instructions Manual Download Page 5

U-20806/U-20807 Adjustable Vertical Indicator Posts

Installation

5

installation instrUctions

Post Targets must be positioned for 

use with the appropriate number 

of turns to open the post indicator 

valve. Improper positioning of the 

Targets can result in an erroneous 

indication of the open or shut 

position of the valve. The U-20806 

Indicator Post will accommodate 

positioning of the Targets to operate 

PIVs requiring 14 to 43 turns to 

open; the U-20807 Indicator Post 

will accommodate positioning the 

Targets to operate PIVs requiring 49 

to 75 turns to open.
NOTE: The Targets for the 

U-20806 Indicator Post have 

been factory set for use with a 6” 

USPVH PIV and the Targets for the 

U-20807 Indicator Post have been 

factory set for a 24” USPVH PIV. 

Consequently, Steps 6 –10 need 

not be performed when installing 

the U-20806 Post with a 6” USPVH 

PIV (or with a PIV that requires 

20

1

/

2

 turns to open) or the U-20807 

Post with a 24” USPVH PIV (or 

with a PIV that requires 75 turns 

to open).

Installing the Post

1. Completely close the PIV.
2. Place approximately 5” high 

blocks onto the stuffing box flange of 

the installed valve. Set the Indicator 

Post onto the blocks and generally 

centered over the PIV operating nut.
3. Slide out the Shipping Disk, and 

allow the Coupling to drop down 

over the PIV operating nut. Attach 

the Coupling to the operating nut 

with the Cotter Pin.
4. Remove the blocks and lower 

the Indicator Post onto the PIV 

stuffing box flange. Bolt the Bell and 

stuffing box flange together using 

the four Cap Screws and Nuts. Also 

at this time make certain that the 

three Cap Screws securing the Bell 

to the Lower Barrel are uniformly 

tightened. 

NOTE: If the pipe is sloped, it may 

be necessary to shim some of the 

Cap Screws with steel washers, 

so that the Post will be plumb and 

the Stem will run true with the 

center of the Post Head. Coupling 

clearances can accommodate a 

maximum pipe slope of 5 degrees. 

It is recommended that a spirit 

level be used to set the vertical 

alignment of the Indicator Post.
5. Order Lengths “C” – “F,” partially 

backfill the trench to a level 4 feet 

below the final grade. Backfilling at 

this point will help maintain vertical 

alignment of the Indicator Post while 

completing the installation.

6. Loosen the Set Screw, and lift the 

Post Head/Upper Stem Assembly 

just high enough to insert a Phillips 

head screwdriver through Hole “A” 

in the Upper Stem. The Phillips head 

screwdriver will temporarily hold the 

Post Head above the upper Barrel.
7. Remove the Wrench, pry off the 

Cap, remove the Retaining Ring, 

and then lift the Post Head clear of 

the Upper Stem Assembly.
8. Position the Targets (see below).
9. Replace the Post Head, Retaining 

Ring, and Cap.
10. Remove the Phillips head 

screwdriver, lower the Post Head, 

and tighten the Set Screw.

positioning of targets

OPEN TARGET:

Top surface of threaded 

flange aligned with 

USPVH Valve size mark 

(10” Valve shown) OR 

set to Dimension “X” 

(see note 2).

SHUT TARGET:

Top surface of 

threaded flange 

aligned with 

CT (center top) 

mark OR bottom 

surface aligned 

with CB (center 

bottom) mark 

(see note 1).

X

OPEN TARGET:

Top surface of 

threaded flange 

aligned with USPVH 

Valve size mark (10” 

Valve shown) OR set 

to Dimension “X” 

(see note 2).

SHUT TARGET:

Top surface of 

threaded flange 

aligned with CT 

(center top) mark 

OR bottom surface 

aligned with CB 

(center bottom) 

mark (see note 1).

X

FOR

LEFT

HAND

OPENING

VALVES

FOR

RIGHT

HAND

OPENING

VALVES

NOTES:

U-20806 INDICATOR POST

1. Set shut target first.  

2. For 16” USPVH Valves (prior to 2012) set to dimension ‘x’ (3.5”)  

3. For valves manufactured by other than USPVH Company, set to dimension ‘x’ 

calculated as follows:                       NO. OF TURNS TO OPEN VAlVE

                                   ‘x’ in inches =  

 

  14

U-20807 INDICATOR POST

1. Set shut target first.

2. For valves manufactured by other than USPVH Company, set to dimension ‘x’ 

calculated as follows:                       NO. OF TURNS TO OPEN VAlVE

                                   ‘x’ in inches =  

 

  22

Summary of Contents for U-20806

Page 1: ...r training and periodic review regarding the use of this equipment is essential to prevent possible serious injury and or property damage The instructions contained herein were developed for using thi...

Page 2: ...ound water supply to automatic sprinkler water spray deluge foam water deluge or standpipe fire protection systems They permit operation of underground valves while providing an above ground visual in...

Page 3: ...ed by each Order Length for the 4 24 USPVH Resilient Wedge PIVs based on the typical diameter of underground pipe For PIVs with different B dimensions the minimum and maximum trench depths which will...

Page 4: ...Min Max Min Max Min Max 16 4 10 6 8 6 5 8 5 8 2 10 2 9 11 11 11 11 8 13 8 13 5 15 5 18 5 5 7 3 7 0 9 0 8 9 10 9 10 6 12 6 12 3 14 3 14 0 16 0 20 5 10 7 8 7 4 9 5 9 1 11 2 10 10 12 11 12 7 14 8 14 4 16...

Page 5: ...ith the center of the Post Head Coupling clearances can accommodate a maximum pipe slope of 5 degrees It is recommended that a spirit level be used to set the vertical alignment of the Indicator Post...

Page 6: ...e into the 1 2 NPT hole provided in the Post Head and then tighten the Locknut against the Post Head to secure the Nipple firmly in place e Refer to Positioning of Targets pg 5 as appropriate and note...

Page 7: ...Short Cotter Pin 290158 17 Threaded Sleeve U 20806 148634 U 20807 241011 18 Upper Stem 148633 19 Weather Cap 290143 20 Retaining Ring 290157 21 OPEN Target U 20806 290144 U 20807 290552 22 SHUT Targe...

Page 8: ...Indicator Post should also be physically tried to be sure that the valve is in the fully open position if there are any damaged parts sign of tampering or the position of the valve is questionable NO...

Reviews: