13
3
1
SPA SET-UP
1.
Move the entire package to the selected site. Open the carton carefully as it can be used to store the spa
during long term storage or when not in use.
2.
Lay out all the parts on the ground and make sure all parts are accounted for. Make sure the spa tub is right
side up. (*For missing or damaged part, contact
)
3.
Spread the Heat Preservation Ground Mat over a cleared area. Spread out the spa liner over the ground
mat. The heat Preservation Mat prevents heat loss from the bottom of the unit.
2
NOTE:
Line
P-SH069:
Spread out
the square ground mat and
place it to the selected site.
Make sure the buckle of
cover and mat is attached
when the spa is not in use.
●
this side
face down
Spa Inflation
4.1 Plug the spa into the grounded supply socket.
4.2 Press the RESET button on the PRCD, the screen on controller shows numbers.
4.3 Turn the inflation knob to the inflation status <ON> and long press (≥2 minutes) the bubble button on
the controller to start inflating until the
yellow
section of the manometer is pushed out.
4.4 Stop pressing the bubble button and turn the knob back to <OFF> for activating other functions.
4.
4.3
4.4
Yellow
ON
OFF
BUBBLE
Summary of Contents for P-SH069
Page 1: ...Owner s Manual P SH069 Line ...
Page 25: ...25 ...
Page 26: ...Manuel d utilisation P SH069 Line ...
Page 51: ......
Page 52: ...Bedienungsanleitung P SH069 Line ...
Page 77: ...26 ...
Page 78: ...Manual del Usuario P SH069 Line ...
Page 103: ...26 ...