
2-11
Getting Started
MS-9A76
4. Place the thermal pad onto the HDD. Check the following picture
for the exact location of the thermal pad. Once the thermal pad is
secured, peel off the yellow protective film.
5. Fit the HDD into the mounting
bracket.
6. Once the HDD has been securely installed, place the HDD set back
to the system. Make sure the HDD set is correctly oriented. Fasten
the HDD set to the system with screws.
Summary of Contents for MS-9A76
Page 1: ...i MS 9A76 Industrial Data Machine ...
Page 8: ......
Page 20: ...1 12 Overview Block Diagram MS 9A76 Q170 C236 ...
Page 21: ...1 13 MS 9A76 Motherboard Jumpers JCMOS1 JAT1 JME1 JCOMP1 ...
Page 23: ...1 15 MS 9A76 Mechanical Overview 4 Slot SKU h h System Dimensions ...
Page 24: ...1 16 Overview h h System Dimensions with Wall Mount ...
Page 25: ...1 17 MS 9A76 h h PCI Express Card Dimensions ...
Page 26: ...1 18 Overview ...
Page 27: ...1 19 MS 9A76 h h PCI Card Dimensions ...
Page 28: ...1 20 Overview ...
Page 29: ...1 21 MS 9A76 Mechanical Overview 2 Slot SKU h h System Dimensions ...
Page 30: ...1 22 Overview h h System Dimensions with Wall Mount ...
Page 31: ...1 23 MS 9A76 h h PCI Express Card Dimensions ...
Page 32: ...1 24 Overview h h PCI Card Dimensions ...
Page 35: ...2 3 MS 9A76 4 Remove the top cover from the system ...
Page 45: ...2 13 MS 9A76 10 Route the cables through the cable routing clip ...
Page 51: ...2 19 MS 9A76 4 Connect the fan power connector to the motherboard ...
Page 54: ...2 22 Getting Started 4 Connect the fan power connector to the motherboard ...
Page 58: ......
Page 82: ......