
Power supply unit
PS-203
Page 11
Table 6 – CL №2. Test of output voltage
To be done
Routine
Man-hours
per 1 Product
Test of output voltage
1 Switch on the Product power supply
2 Connect a voltmeter to output terminals of the
Product
3 Supply power to the Product
4 Measure voltage on the output terminals
1 person
15 mins
3.4
P
RESERVATION
The Product and set of operational documents are stored in preserved condition
in Manufacturer’s packaging boxes.
Time of represervation – 2 years since the date of packaging at the Manufactur-
er’s plant.
The preservation is done in full terms, for 2 years, applying protection and
packaging.
The represervation is done in heated rooms in the same order as the preserva-
tion.
The Product after represervation and documents are placed in packaging.