MSA PS-103 Operating Manual Download Page 9

«NPK Morsvyazavtomatica» LLC

  

 

          

Operating manual

 

Page 9 

 

 

Table 5 – Amount of consumables required for TS 

Name and identifier of consumables  

Amount of 

consumables 

Note 

Main 

Replacement  

Cleaning cloth 

Cleaning cloth 

0.10 kg 

To  clean  surfaces  of  the 
unit  

Rectified hydrolytic technical 
ethyl alcohol  

Technical ethyl alcohol 
class А  

0.01 l 

1 To clean severe contami-
nation from surfaces of the 
unit  
2 To clean by rubbing sur-
faces  with  paint  coating 
damage  

Varnish 
АК-113  

Varnish 
АК-113Ф  

0.05 kg 

To  cover  surfaces  of  the 
unit in case of paint coating 
damage  

Abrasive cloth  

Abrasive cloth 

0.06 х 0.06 m 

To  polish  surfaces  of  the 
unit in case of paint coating 
damage  

1.5

 

M

ARKING AND SEALING

 

The  nameplates  are  located  on  the  Product,  where  the  user  can  find  the  name, 

serial number, date of manufacturing, weight, protection degree, output voltage and out-
put power of the Product. 

The sealing of the Product is not provided.  

1.6

 

P

ACKAGING

 

At the time of delivery the Product is packed in a corrugated board box and inner pack-
aging ensuring its transportation and storage at the warehouse. 

Transport packaging is also used as a returnable packaging for transportation of 

the Product to the repair location and back. 

The sealing of transport packaging is not provided. 

2

 

USAGE OF THE PRODUCT 

2.1

 

O

PERATIONAL CONSTRAINTS 

 

The Product shall be installed only according to its outline dimensions.  

Caution! 

Distance between the installation site and magnetic compass shall not 

be less than 1 m 

Summary of Contents for PS-103

Page 1: ...v 0 7 NPK Morsvyazavtomatica LLC Power Supply unit PS 103 PS 103 20 Operating manual St Petersburg...

Page 2: ...g 9 1 6 Packaging 9 2 USAGE OF THE PRODUCT 9 2 1 Operational constraints 9 2 2 Usage preparations 10 2 3 Usage of the product 11 3 TECHNICAL SERVICE 12 3 1 General description 12 3 2 Safety features 1...

Page 3: ...Product PSU In addition to the instructions given in this document the safety regulations and rules applicable in the field shall be observed Only those who have read and understood this document and...

Page 4: ...put voltage AC 50 60 Hz V 220 110 at option 10 Standby power from batteries V DC 24 Output voltage V DC 18 31 Rated load current 10 20 Rated power W output 190 400 consumed 240 450 Alarm output dry co...

Page 5: ...Controls and indication The layout of the PSU s key functional elements controls and indication are rep resented in Figures 1 2 Figure 1 Functional elements controls and indication of PS 103 Figure 2...

Page 6: ...ed to PS 103 and PS 103 20 terminals standby power is supplied from backup power sources to provide uninterruptible opera tion of the equipment connected to the PSU see figures 3 4 Caution The PSU sha...

Page 7: ...r Terminal Description XS1 1 Alarm unit connection 2 3 XS5 1 24 V DC SB connection 2 0 V 3 Ground connection XS2 1 24 V DC to connect load 3 2 0 V 3 Ground connection XS3 1 24 V DC to connect load 2 2...

Page 8: ...supplies power from SB to the external signaling unit Figure 4 Connection diagram of PS 103 20 Table 4 Description of connector terminals PS 103 20 Connector Terminal Description X9 1 Alarm unit conne...

Page 9: ...t coating damage 1 5 MARKING AND SEALING The nameplates are located on the Product where the user can find the name serial number date of manufacturing weight protection degree output voltage and out...

Page 10: ...g the units on the staff shall observe visually the cable integrity and initial position of the controls on the front panels check the absence of dust and dirt on the Product casing clean with a soft...

Page 11: ...transfer piano type switch to ON position If you use PS 103 20 additionally transfer a circuit breaker inside the casing to ON position check load operation To switch the PSU off provide the followin...

Page 12: ...rk is obligatory Table 7 Checklist 1 Visual check of the Product To be done Routine Man hours per 1 Product Visually examine the Product 1 check completeness and appearance of the Product mechanical d...

Page 13: ...3 take the voltage on the load terminals 1 person 5 mins 3 4 PRESERVATION The Product and set of operational documents are stored in preserved condition in Man ufacturer s packaging boxes The time of...

Page 14: ...if power supply of the repaired unit is on Installation aligning and repair works are PROHIBITED in the room where less than 2 people are present 4 3 CURRENT REPAIR OF THE PRODUCT The list of malfunct...

Page 15: ...rage conditions 5 40 with the concentration of dust oil moisture and aggressive impu rities in the air within the required limits for the working areas of production facilities After storage or transp...

Page 16: ...sportation in sealed and heated compartments sea transportation in dry service premises The units must be transported in compliance with transportation rules applicable for each means of transport Dur...

Page 17: ...d an overage equipment unit to the manufacturer for its further disposal Proper disposal of Product components allows avoiding possible negative envi ronmental and health impacts and it also allows fo...

Page 18: ...tica LLC Operating manual Page 18 ANNEX A MANDATORY OUTLINE AND INSTALLATION DIMENSIONS OF THE PRODUCT Figure A 1 Outline and installation dimensions of PS 103 Figure A 2 Outline and installation dime...

Reviews: