Select the installation site in compliance with operational constraints (operating 

temperature and protection degree – IP). 

2.2

 

U

SAGE PREPARATIONS 

 

2.2.1

 

Safety features  

While preparing the Product for operation, check it visually after unpacking; me-

chanical damage shall be absent. 

Connection  to  power  mains  shall  be  provided  only  in  compliance  with  input 

power requirements.  

Before connecting the Product shall be switched off and have a proper grounding.  

While using the Product the staff shall follow “The technical rules for operation 

of electric installation” and “Safety rules for operation of electric installation” while test-
ing electrical circuits and insulation resistance.

 

2.2.2

 

Visual check procedure 

Before switching the units on, the staff shall: 

 

observe visually the cable integrity and initial position of the controls on the 
front panels; 

 

check the absence of dust and dirt on the Product casing; clean with a soft cloth 
if necessary; 

– check that cable connectors are securely connected to the Product.  

2.2.3

 

Directions for switching on  

While connecting the PSU and preparing it for operation follow the steps below:  
– transfer circuit breakers of main power and PSU on the power mains switch-

board to “OFF” position;  

– connect deenergized cable of main power and SB to input terminals;   
– transfer circuit breakers of main power and PSU on the power mains switch-

board to “ON” position;  

– transfer a circuit breaker inside the Product casing to “ON” position (only for 

PS-103-20); 

– transfer a piano type switch to “ON” position;  
– check that the Product is connected properly and main power is available by 

green LED glowing on the piano type switch, located on the Product casing, dry contact 
alarm shall be absent; 

Summary of Contents for PS-103

Page 1: ...v 0 7 NPK Morsvyazavtomatica LLC Power Supply unit PS 103 PS 103 20 Operating manual St Petersburg...

Page 2: ...g 9 1 6 Packaging 9 2 USAGE OF THE PRODUCT 9 2 1 Operational constraints 9 2 2 Usage preparations 10 2 3 Usage of the product 11 3 TECHNICAL SERVICE 12 3 1 General description 12 3 2 Safety features 1...

Page 3: ...Product PSU In addition to the instructions given in this document the safety regulations and rules applicable in the field shall be observed Only those who have read and understood this document and...

Page 4: ...put voltage AC 50 60 Hz V 220 110 at option 10 Standby power from batteries V DC 24 Output voltage V DC 18 31 Rated load current 10 20 Rated power W output 190 400 consumed 240 450 Alarm output dry co...

Page 5: ...Controls and indication The layout of the PSU s key functional elements controls and indication are rep resented in Figures 1 2 Figure 1 Functional elements controls and indication of PS 103 Figure 2...

Page 6: ...ed to PS 103 and PS 103 20 terminals standby power is supplied from backup power sources to provide uninterruptible opera tion of the equipment connected to the PSU see figures 3 4 Caution The PSU sha...

Page 7: ...r Terminal Description XS1 1 Alarm unit connection 2 3 XS5 1 24 V DC SB connection 2 0 V 3 Ground connection XS2 1 24 V DC to connect load 3 2 0 V 3 Ground connection XS3 1 24 V DC to connect load 2 2...

Page 8: ...supplies power from SB to the external signaling unit Figure 4 Connection diagram of PS 103 20 Table 4 Description of connector terminals PS 103 20 Connector Terminal Description X9 1 Alarm unit conne...

Page 9: ...t coating damage 1 5 MARKING AND SEALING The nameplates are located on the Product where the user can find the name serial number date of manufacturing weight protection degree output voltage and out...

Page 10: ...g the units on the staff shall observe visually the cable integrity and initial position of the controls on the front panels check the absence of dust and dirt on the Product casing clean with a soft...

Page 11: ...transfer piano type switch to ON position If you use PS 103 20 additionally transfer a circuit breaker inside the casing to ON position check load operation To switch the PSU off provide the followin...

Page 12: ...rk is obligatory Table 7 Checklist 1 Visual check of the Product To be done Routine Man hours per 1 Product Visually examine the Product 1 check completeness and appearance of the Product mechanical d...

Page 13: ...3 take the voltage on the load terminals 1 person 5 mins 3 4 PRESERVATION The Product and set of operational documents are stored in preserved condition in Man ufacturer s packaging boxes The time of...

Page 14: ...if power supply of the repaired unit is on Installation aligning and repair works are PROHIBITED in the room where less than 2 people are present 4 3 CURRENT REPAIR OF THE PRODUCT The list of malfunct...

Page 15: ...rage conditions 5 40 with the concentration of dust oil moisture and aggressive impu rities in the air within the required limits for the working areas of production facilities After storage or transp...

Page 16: ...sportation in sealed and heated compartments sea transportation in dry service premises The units must be transported in compliance with transportation rules applicable for each means of transport Dur...

Page 17: ...d an overage equipment unit to the manufacturer for its further disposal Proper disposal of Product components allows avoiding possible negative envi ronmental and health impacts and it also allows fo...

Page 18: ...tica LLC Operating manual Page 18 ANNEX A MANDATORY OUTLINE AND INSTALLATION DIMENSIONS OF THE PRODUCT Figure A 1 Outline and installation dimensions of PS 103 Figure A 2 Outline and installation dime...

Reviews: