Remote Alarm units
AU-106, AU-206
15
Table 8 – Check list № 3. Insulation resistance check of power circuits
To be done
Routine
Man-hours per
1 Product
Insulation resistance
check of power cir-
cuits
Using ohmmeter check insulation resistance between
conductors and the Product’s casing. Insulation re-
sistance shall not exceed 1 Mohm
1 person
15 mins
Table 9 – Check list № 4. Test of output voltage conformance
To be done
Routine
Man-hours per
1 Product
Test of output volt-
age conformance
Connect voltmeter to output contacts. Measure voltage
on the output terminals. Voltage value shall not exceed
the value represented in Table 1
1 person
15 mins
3.4
P
RESERVATION
The Product and set of operational documents are stored in preserved condition in Manu-
facturer’s packaging boxes.
The time of represervation – 2 years from the Manufacturer’s commissioning.
The preservation is done in full terms, for 2 years, applying protection and packaging.
The represervation is done in heated rooms in the same order as the preservation.
The represerved Product and documents are placed in package.
Summary of Contents for AU-106
Page 2: ......