1
、
Out of the box check
a) Before receiving the instrument, you should carefully check for transport damage. If
so, please reject the goods and inform the Company in writing and take pictures of
the damaged machine.
b) check whether the goods match the order list, if not, please contact the company.
c) 1.3, remove the packaging, and remove the contents of the centrifugal chamber.
2
、
Installation
a) Installation site requirements
the installation of the table should be strong, dry room, clean, to avoid direct
sunlight.
the room should have a separate ground, to ensure safe use of electricity.
b) the installation of the centrifuge
A), the centrifuge installed to a solid table to ensure that the four foot contact with
the table.
B), centrifuge around the gap with the wall should be greater than 16cm, to ensure
good ventilation.
C), power exchange 220V 50Hz 10A or 110v 60Hz, the wire cross-sectional area of
not less than 2 square millimeters, the socket capacity of not less than 10A, the
protective grounding wire must be connected firmly.
X
、
MAINTENANCE
1. After using, such as the day is no longer used, please use a clean soft cloth to clean the
centrifuge chamber, rotor and centrifuge tube.
2. Regularly check the rotor and centrifuge tube is cracked.
3. If not use the machine more than a month time, please remove the rotor from the
centrifuge chamber, the rotor center hole and centrifuge spindle coated with grease, keep
the rotor dry.
4. regular inspection of moving parts, such as gas spring seat, lid hinges and other screws
fastening.
XI
、
WARRANTY