TO GENERATOR
TO LIGHT
mr
.
steam
®
chromasteam
™
Installation and Operating Instructions
2
Installation to be performed by a
qualified and licensed electrician.
Insure that power is not supplied to
the field wiring during installation. Turn off power at
breaker panel.
Insulation must be a minimum of
3
”
away from all sides of the fixture assembly.
1.
Determine the placement of the light.
Do not install the fixture assembly
(light) where direct contact with steam or water emis-
sion could occur. Do not install the light in a location
where it could become submerged.
2.
The light requires a
4
1
⁄
4
" diameter hole for mounting.
3.
Provide electrical service (
120
VAC) with flexible
cable only. Pass cable through ceiling opening and
wire fixture in accordance with NEC and local elec-
trical code.
DO NOT install the wall switch in
the steam room. The switch must be installed in a
location and manner described in the NEC and local
electric codes.
Do not use a dimmer switch to
control the ChromaSteam Lights
4.
Route the 30 foot cable supplied with the ChromaSteam
from your steam bath generator through one of the
knockouts in the ChromaSteam light wiring box.
Provide a suitable strain relief bushing.
IMPORTANT NOTE:
The quick connect tabs should
be on the generator side, the Molex connector should be
routed to the light, see figure 2.
5.
Connect the quick connect tabs to the control board in
the generator at the location marked CHROMA, see
figure 4.
6.
Remove the red jumper wire shown in figure 3 and
discard. Connect the wire from the steam generator to
the connector where the jumper was.
7.
Connect the supply wires per the wiring diagram shown
on page 4. Use suitable wire nuts (not included) to
insulate and secure the supply connections.
8.
Connect copper ground wire from wiring box to ground
wire from electrical service using a wire nut to secure
the connection.
9.
Use the support adjustment screw shown to provide sup-
port for the housing on the inside surface of the ceiling
when installed.
10.
With the clips folded into the fixture as shown in
figure 1 insert the wired housing into the ceiling
junction box first as shown in figure 2.
WARNING
!
WARNING
!
WARNING
!
CAUTION
!
WARNING
!
CAUTION
!
3"
MIN. CLEARANCE ALL AROUND
AND BETWEEN FIXTURE AND INSULATION
FIXTURE MUST BE INSTALLED IN A DRY LOCATION
Retainer Clip
Pulled In During
Installation
Support
Adjustment Screw
3"
3"
3"
Retainer clips
locked in place
to secure fixture
1
⁄
2
"– 1
1
⁄
8
"
Ceiling Thickness
STEAM ROOM
INSTALLATION with iTEMPO/PLUS
®
and eTEMPO/PLUS
®
CONTROL
IMPORTANT NOTE:
Only one MS CHROMA light may be connected to the control board in the steam generator.
Figure 1
Figure 2
Figure 3
Figure 4