![Moxa Technologies ToughNet TN-5516 Series Hardware Installation Manual Download Page 10](http://html1.mh-extra.com/html/moxa-technologies/toughnet-tn-5516-series/toughnet-tn-5516-series_hardware-installation-manual_1842454010.webp)
STEP 3:
Positio
itch on the
n the ToughNet sw
DIN-R
lamps ove
ail, tilting to hook c
r
the top
STEP 4:
Swing the switch down fully onto the
edge of the rail.
DIN-Rail, until both clamps
completely latch.
DIN-Rail
DIN-Rail
everse Step 3 and 4
To remove the Moxa ToughNet Switch from the DIN-Rail, use a
screwdriver to pull out the two spring-loaded brackets from the bottom
until they are fixed in the “locked” position. Then r
above.
DIN-Rail
Wiring Requirements
WARNING
Turn the power off before disconnecting modules or wires. The
correct power supply voltage is listed on the product label. Check
the voltage of your power source to make sure you are using the
correct voltage. Do NOT use a voltage greater than what is
specified on the product label.
These devices must be supplied by a SELV source as defined in
the Low Voltage Directive 2006/95/EC and 2004/108/EC.
ATTENTION
Safety First!
Be sure to disconnect the power cord before installing and/or
wiring your Moxa switch.
This device has UL508 approval. Use copper conductors only,
60/75°C, and tighten to 4.5 pound-inches. For use in pollution
degree 2 environments.
- 10 -